Support

Preferred Options consultation document

Representation ID: 93289

Received: 08/10/2019

Respondent: Four Leaf Enterprises Limited

Agent: Stephen M Daw Limited

Representation Summary:

This Site will make a valuable contribution of high-grade aggregate to the total mineral resource required over the Plan Period, i.e. until 2036 and the Site should therefore be made an Allocation. Mineral extraction on land immediately to the south at Carbrooke Quarry has taken place over a considerable number of years without significant impact and without complaint.

Full text:

This Site will make a valuable contribution of high-grade aggregate to the total mineral resource required over the Plan Period, i.e. until 2036 and the Site should therefore be made an Allocation. Mineral extraction on land immediately to the south at Carbrooke Quarry has taken place over a considerable number of years without significant impact and without complaint.