Minerals and Waste Local Plan: Pre-Submission Publication

Ended on the 19 December 2022

Mineral Extraction Sites

(2) Sand and gravel

The following sites were proposed for sand and gravel extraction by mineral operators and are allocated to meet the forecast sand and gravel need during the plan period. The assessments for all the allocated sites are included in this document. Policy MP1 'Provision for minerals extraction' states that specific sites for at least 12.597 million tonnes of sand and gravel will be allocated. The following 16 sites with an estimated resource of 18.145 million tonnes are allocated to meet the forecast sand and gravel need during the plan period. 15.4 million tonnes of the estimated resource are expected to be extracted within the plan period with a further 1.4 million tonnes already included in the existing landbank.

Parish

Site reference

Location

Estimated total resource (tonnes)

Estimated resource (tonnes) available during the plan period 2021-2038

Planning status at 31.12.2021

Beetley

MIN 12

land north of Chapel Lane

1,175,000

1,120,000

No planning application

Beetley

MIN 51 & MIN 13 & MIN 08

land west of Bilney Road

1,830,000

1,480,000

No planning application

Carbrooke

MIN 200

land west of Cuckoo Lane

300,000

300,000

No planning application

Attlebridge

MIN 202

land south of Reepham Road,

545,000

545,000

Planning application submitted in 2018 and being determined

Frettenham and Buxton with Lammas

MIN 37

land at Mayton Wood, Coltishall Road, Buxton

1,450,000

1,450,000

Permission granted June 2021

Horstead with Stanninghall

MIN 64

land at Grange Farm, Buxton Road, Horstead

650,000

650,000

Permission granted May 2021

Horstead with Stanninghall

MIN 65

land north of Stanninghall Quarry

3,745,000

3,745,000

Permission granted August 2021

Spixworth

MIN 96

land at Grange Farm (between Spixworth Road and Coltishall Lane)

1,600,000

1,600,000

No planning application

Tottenhill

MIN 206

land at Oak Field, west of Lynn Road

750,000

750,000

Planning application submitted in 2021 and being determined

Aylmerton

MIN 69

land north of Holt Road

2,000,000

700,000

(northern part of site received permission in 2020 so 1 million tonnes already included in the landbank)

Permission granted for northern part of site in October 2020

North Walsham

MIN 115

land at Lord Anson's Wood, near North Walsham

1,100,000

960,000

No planning application

Edgefield

MIN 207

land at Pinkney Field, Briston

400,000

N/A site received permission in 2019 so already included in the landbank

Permission granted in August 2019

East Beckham

MIN 208

land south of Holt Road

1,320,000

800,000

No planning application

Haddiscoe

MIN 25

land at Manor Farm (east of Crab Apple Lane)

1,300,000

1,300,000

No planning application

N/A

N/A

TOTAL

18,165,000

15,400,000

N/A

Carstone

The carstone resource in Norfolk is only located in West Norfolk. Only one site has been proposed (by Middleton Aggregates Ltd) for carstone extraction, with an estimated mineral resource of 1,416,000 tonnes. The assessment of the carstone site is included in this document. This site is concluded to be suitable to allocate for carstone extraction and would provide flexibility to meet any future increase in demand for Carstone during the Plan period.

Parish

Site reference

Location

Estimated resource (tonnes)

Estimated resource available during the plan period 2021- 2038

Planning status at 31.12.2021

Middleton

MIN 6

land off East Winch Road, Mill Drove

1,416,000

1,120,000

No planning application

Silica Sand

The silica sand resource in Norfolk is only located in West Norfolk. Two sites with an estimated resource of 4.1 million tonnes will be allocated for silica sand extraction. Both sites have been proposed by Silbelco UK Ltd. The assessments of these two sites are included in this document. These two sites would not meet the forecast need of 10.34 million tonnes of silica sand during the plan period. Therefore, a criteria-based policy (MPSS1) for planning applications for silica sand extraction is also included in the Minerals and Waste Local Plan.

Parish

Site reference

Location

Estimated resource (tonnes)

Resource available during the plan period 2021-2038 (tonnes)

Planning status at 31.12.2021

East Winch

MIN 40

land east of Grandcourt Farm

3,000,000

3,000,000

Planning application submitted in 2018 and being determined

Bawsey

SIL01

land at Mintlyn South

1,100,000

1,100,000

Permission granted August 2021

N/A

TOTAL

N/A

4,100,000

4,100,000

N/A