Proposed Main Modifications

Search representations

Results for Anglian Water search

New search New search

Support

Proposed Main Modifications

MM21 - Policy WP3. Land suitable for waste management facilities, Page 54

Representation ID: 99586

Received: 12/12/2024

Respondent: Anglian Water

Representation Summary:

Anglian Water supports the amendment to the policy to allow greater flexibility in how waste is managed at our sludge treatment centres. This represents the amendment agreed in the SoCG.

Support

Proposed Main Modifications

MM26 - Paragraph W15.2, Page 64

Representation ID: 99587

Received: 12/12/2024

Respondent: Anglian Water

Representation Summary:

Anglian Water supports the modification which reflects the wording suggested in our hearing statement and aligns with our Business Plan and Asset Management Periods (AMP) of five years, that outline the investments being made during this period.
A minor clarification – should the final paragraph of the modification text be sub-paragraph c)?

Support

Proposed Main Modifications

MM27 - Paragraph W15.5, Page 64

Representation ID: 99588

Received: 12/12/2024

Respondent: Anglian Water

Representation Summary:

Anglian Water supports the modification to Paragraph W15.5 which reflects the wording suggested in our hearing statement and our internal decision-making processes that must be followed to deliver planned investments at Whitlingham WRC during the AMP.

Support

Proposed Main Modifications

MM28 - Policy WP15. Whitlingham Water Recycling Centre, Page 65

Representation ID: 99589

Received: 12/12/2024

Respondent: Anglian Water

Representation Summary:

Anglian Water supports the modification to Policy WP15 that appropriately clarifies the medium-term strategy for Whitlingham WRC – consistent with the interpretation of this strategy in MM27.

Support

Proposed Main Modifications

MM50 - Policy MPSS1. Silica Sand Extraction Sites, Page 77

Representation ID: 99590

Received: 12/12/2024

Respondent: Anglian Water

Representation Summary:

Anglian Water supports the modification to Policy MPSS1 requirement (i) to ensure appropriate measures are taken regarding the protection of our assets.

Object

Proposed Main Modifications

MM25 - Policy WP14. Water Recycling Centres, Page 66

Representation ID: 99591

Received: 12/12/2024

Respondent: Anglian Water

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

With regards to the MM to insert "and/or d. comply with new legislation and/or e. incorporate climate change adaption and mitigation measures (as detailed in Policy MW3)".
Anglian Water supports the amendment to the policy to insert clause d. to address that future development proposals at our water recycling centres (WRCs) that may include climate change mitigation and adaptation measures to help meet our Net Zero Strategy commitments. This represents the amendment agreed in the SoCG.
With regards to the MM to insert the following new text before the last sentence in the policy: "Where appropriate, applications will also need to demonstrate the contribution that the development would make to water quality improvement".
This additional clause did not form part of the agreed amendment specified in the SoCG for Policy WP14. Therefore, it does not clearly represent our previous submissions to the Local Plan consultation or examination.
We consider that the additional new text before the last sentence in Policy WP14 is unnecessary as the need to demonstrate the contribution that the development would make to water quality is part of the regulatory permitting system that is overseen by the Environment Agency and includes legislative requirements. Therefore, we object to the insertion of this text as it is subject to a separate permitting system which includes environmental obligations through our Water Industry National Environment Programme (WINEP) to ensure we deliver our fair share of water quality objectives.

Comment

Proposed Main Modifications

Schedule of Proposed Main Modifications to the Norfolk Minerals and Waste Local Plan

Representation ID: 99634

Received: 12/12/2024

Respondent: Anglian Water

Representation Summary:

1. Anglian Water and Minerals and Waste Plans
1.1. Anglian Water is the statutory water and sewerage undertaker for the majority of Norfolk and a statutory consultee under The Town and Country Planning (Local Planning) (England) Regulations 2012. Anglian Water wants to proactively engage with the local plan process to ensure the plan delivers benefits for residents and visitors to the area, and in doing so protect the environment and water resources. As a purpose-led company, we are committed to seeking positive environmental and social outcomes for our region.

Anglian Water has engaged with Norfolk County Council throughout the preparation of the Norfolk and Minerals Waste Plan, as documented in the Statement of Common Ground (SoCG) [A19] and our hearing statement for the examination [F28].

3. Fens Reservoir – Nationally Significant Infrastructure Project
3.1 As the Council will be aware, Anglian Water and Cambridge Water are progressing the Fens Reservoir through the RAPID gated process, recognising the need to plan long term for our region’s future water needs. Fens Reservoir is a 55 million cubic metres (MCM) raw water reservoir, with a useable volume of 50 MCM, located to the north of Chatteris, with a useable volume of 50 MCM.
3.2 Anglian Water recently undertook a second stage non-statutory consultation on the Fens Reservoir. As the host authority for some of the associated infrastructure to bring water into the Anglian Water network – with a pipeline around Downham Market and service reservoir at Bexwell – Norfolk County Council has indicated in their submission the Minerals and Waste implications. These include safeguarded mineral resources within the pipeline corridor and service reservoir polygon.
3.3 Anglian Water acknowledges that further investigation and assessment will be required through the DCO process to determine whether the construction of the associated infrastructure will result in the extraction of silica sand and carstone suitable for commercial use or reuse in the Project.
3.4 Following review of the main modifications, we do not consider that they present any additional constraints to the delivery of the Project that will help support sustainable growth in the region.
4. Conclusion
4.1 Anglian Water welcomes the opportunity to comment on the main modifications, which we generally support, given our engagement with the Council throughout the plan-making process.

For instructions on how to use the system and make comments, please see our help guide.