Proposed Main Modifications

Search representations

Results for Breedon Trading Limited search

New search New search

Object

Proposed Main Modifications

MM43 - Policy MP1. Provision for mineral extraction, Page 72

Representation ID: 99603

Received: 13/12/2024

Respondent: Breedon Trading Limited

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Breedon objects to this Main Modification MM43. MM43 is not positively prepared and is not consistent with national policy.
Breedon welcome the overall more positive approach and rewording to reflect that sand and gravel extraction will be supported and not resisted, however MM43 does not go far enough to ensure the steady and adequate supply of sand and gravel.
As already set out the use of 10-year sales plus a 10% buffer does not meet forecast growth outlined the LAA. Breedon suggests either a 20-year sales average or 10-year sales average plus a 20% buffer would better meet objectively assessed need.
The Council has an obligation to provide a steady and adequate supply of sand and gravel under Paragraph 226 of the NPPF which is defined as maintaining landbanks of at least 7 years for sand and gravel. As such supporting proposed extraction in a scenario where sand and gravel landbank is already below 7 years is in itself contrary to the NPPF. Policy MP1 must prevent this scenario from occurring rather than providing support where this important national policy is breached. Therefore, MM43 should be changed so that NNC support mineral extraction outside of allocated sites where the development is required to maintain a 7-year landbank.
Breedon also considers the criteria used in MP1 of overriding benefit, overriding justification and proposed extraction to maintain the landbank of permitted sand and gravel above 7 years should be met individually and therefore ‘or’ should be used rather than ‘and/or’ within the policy wording. Breedon suggests amending the wording such that it may be possible for development to meet one or more criterion with an overarching requirement to be consistent with all other relevant policies set out in the Development Plan.

This is especially pertinent given the recent publication of the NPPF and the delivery of 1.5 million homes and increased growth and development aspirations. This is not considered by the current LAA (notwithstanding our concern that the Plan does not fully consider demand outlined in the LAA) therefore it is essential that increased flexibility is introduced into MP1 because demand for sand and gravel is likely to increase significantly.

Attachments:

Object

Proposed Main Modifications

MM44 - Paragraph MP1.25, Page 72

Representation ID: 99604

Received: 13/12/2024

Respondent: Breedon Trading Limited

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Breedon objects to this Main Modification MM44. MM44 is not positively prepared and is not consistent with national policy.
Breedon has set out that further flexibility is required to respond to increasing demand for sand and gravel. Indeed the Inspector asked NCC at the EIP to add examples of overriding planning reasons to provide flexibility to respond to changes in demand. MM44 does not provide examples of scenarios where there would be overriding planning reasons due to increase growth or demand rather isolated examples which might coincidentally increase supply. Breedon does not consider that NCC has met the Inspector’s request. The NCC examples given, agricultural irrigation schemes and extraction prior to sterilisation are windfall sites, where prior extraction can take place rather than the mineral extracted to meet overriding need or public benefit.

This is especially pertinent given the recent publication of the NPPF and the delivery of 1.5 million homes and increased growth and development aspirations. This is not considered by the current LAA (notwithstanding our concern that the Plan does not fully consider demand outlined in the LAA) therefore it is essential that increased flexibility is introduced into the supporting text of MP1 because demand for sand and gravel is likely to increase significantly.

Attachments:

Comment

Proposed Main Modifications

MM32 - Paragraph MP1.6, Page 68

Representation ID: 99605

Received: 13/12/2024

Respondent: Breedon Trading Limited

Representation Summary:

Breedon has no objection to this Main Modification MM32.

Attachments:

Comment

Proposed Main Modifications

MM45 - Paragraph MP1.26, Page 72 / 73

Representation ID: 99606

Received: 13/12/2024

Respondent: Breedon Trading Limited

Representation Summary:

Breedon has no objection to this Main Modification MM45.

Attachments:

Comment

Proposed Main Modifications

MM54 - Policy MP7. Progressive Working, Restoration and Afteruse, page 82

Representation ID: 99607

Received: 13/12/2024

Respondent: Breedon Trading Limited

Representation Summary:

Breedon has no objection to this Main Modification MM54. It should be noted that measurable 10% biodiversity gain will not need to use the biodiversity net gain matrix calculator where the development proposal is exempt from BNG under the BNG Regulations.

Attachments:

Comment

Proposed Main Modifications

MM55 - Paragraph MP8.1, Page 83

Representation ID: 99608

Received: 13/12/2024

Respondent: Breedon Trading Limited

Representation Summary:

Breedon has no objection to this Main Modification MM55.

Attachments:

Comment

Proposed Main Modifications

MM56 - Paragraph MP8.3, Page 83

Representation ID: 99609

Received: 13/12/2024

Respondent: Breedon Trading Limited

Representation Summary:

Breedon has no objection to this Main Modification MM56.

Attachments:

Comment

Proposed Main Modifications

MM57 - Policy MP8. Aftercare, page 83

Representation ID: 99610

Received: 13/12/2024

Respondent: Breedon Trading Limited

Representation Summary:

Breedon has no objection to this Main Modification MM57.

Attachments:

Comment

Proposed Main Modifications

MM58 - Paragraph MP11.4, Page 85

Representation ID: 99611

Received: 13/12/2024

Respondent: Breedon Trading Limited

Representation Summary:

Breedon has no objection to this Main Modification MM58.

Attachments:

Comment

Proposed Main Modifications

MM60 - Mineral extraction sites - sand and gravel table, Pages 100 and 101

Representation ID: 99612

Received: 13/12/2024

Respondent: Breedon Trading Limited

Representation Summary:

Breedon has no objection to this Main Modification MM60.

Attachments:

For instructions on how to use the system and make comments, please see our help guide.