Proposed Main Modifications

Search representations

Results for Environment Agency search

New search New search

Comment

Proposed Main Modifications

MM07 - Policy MW3. Climate change mitigation and adaption, Page 39

Representation ID: 99645

Received: 27/12/2024

Respondent: Environment Agency

Representation Summary:

We note there is lack of reference to Groundwater in Main Modification 07 relating to Climate Change Mitigation and Adaptation and advise this be included. The inclusion of increased river flows is a sensible addition, particularly relating to flood risk. As mineral developments have the potential to impact groundwater resources, we suggest the addition "increasingly variable groundwater levels" or something similar to reflect the predicted climate impacts to groundwater due to Climate Change, inclusive of flood risk caused by high groundwater levels and droughts associated with low groundwater levels.

Attachments:

Comment

Proposed Main Modifications

MM43 - Policy MP1. Provision for mineral extraction, Page 72

Representation ID: 99646

Received: 27/12/2024

Respondent: Environment Agency

Representation Summary:

We note that the main policy changes relevant to Groundwater and Contaminated Land are around the changing of position to one of supporting new sites not currently allocated in the waste and mineral plans. Whilst we recognise that this gives flexibilty within the planning regime to increase the reserves of minerals going forward, the risk that we will not have a chance to comment on the suitability of the site via the waste and mineral plan site allocations consultation will exist. We would question if any sites put forward for planning approval that are not allocated within the waste and mineral plan carry the same weight of 'presumption of being granted planning permission' as those currently allocated.
Most of the relevant change in policy wording link to Carstone and Silica sand reserves rather than the sands and gravels. It would appear that the sands and gravel reserves are 'healthy' i,e above target, whereas the carstone reserves are about on target with the silica sand reserves being below target based on currently allocated sites. Pressure to grant planning permission potentially on unseen sites for carstone and silica sands production is of concern, especially as these sites, given their limited geographical extent, tend to require substantial amounts of de-watering within the principal aquifer and can be associated with sensitive surface water receptors. This point mentioned is just to be highlighted for yourself and does not form any opposition to the plan.

Attachments:

Comment

Proposed Main Modifications

MM54 - Policy MP7. Progressive Working, Restoration and Afteruse, page 82

Representation ID: 99647

Received: 27/12/2024

Respondent: Environment Agency

Representation Summary:

This is unlikely to be the correct time to suggest inclusion of additional changes, but the lack of reference to subsurface conditions in MP7 could be considered for inclusion at the next review. Post-works remediation needs to consider the subsurface and groundwater environments in that it should be restored to reflect the pre-works hydrogeological conditions.

Attachments:

Support

Proposed Main Modifications

MM63 - Policy MIN 12. Land North of Chapel Lane, Beetley, page 107

Representation ID: 99648

Received: 27/12/2024

Respondent: Environment Agency

Representation Summary:

Generally, the inclusion of conditions that certain sand and gravel minerals sites are to be worked above the water table are something we support, as impacts to groundwater by quarried sites can be detrimental to groundwater dependent sites and watercourses in an already water-stressed area.

Attachments:

Support

Proposed Main Modifications

MM64 - Policy MIN 51/ MIN13/ MIN 08. Land West of Bilney Road, Beetley, page 111

Representation ID: 99649

Received: 27/12/2024

Respondent: Environment Agency

Representation Summary:

Generally, the inclusion of conditions that certain sand and gravel minerals sites are to be worked above the water table are something we support, as impacts to groundwater by quarried sites can be detrimental to groundwater dependent sites and watercourses in an already water-stressed area.

Attachments:

For instructions on how to use the system and make comments, please see our help guide.