Object

Initial Consultation document

Representation ID: 91988

Received: 08/08/2018

Respondent: Mr Paul Dixon

Representation Summary:

Shouldham/Marham proposal would require diversion of PRoW FP9. This is the only direct route to the river from the village and if removed would leave just the path via Marham Fen, or a route through Shouldham Warren. Both at unacceptable distances from FP9 and this part of the village. FP9 diversion not to be greater than 100m at any point from present position.

Full text:

Shouldham/Marham proposal would require diversion of PRoW FP9. This is the only direct route to the river from the village and if removed would leave just the path via Marham Fen, or a route through Shouldham Warren. Both at unacceptable distances from FP9 and this part of the village. FP9 diversion not to be greater than 100m at any point from present position.