Object

Initial Consultation document

Representation ID: 92277

Received: 13/08/2018

Respondent: Mr Daryl Packer

Representation Summary:

1. Where is the detailed plan outlining all areas affected by the exploitation ie areas under potential risk "Devil's End Meadow" by Min25?
2. Where is the site specific plan showing position of the processing plant?
3. What compensation will be offered to properties directly affected by the works?
4. What will the closest proximity of the deposit exploitation be to the boundary of any directly affected property?
5. To what depth will the deposit be extracted to?
6. Will the reinstatement of the site be 100% accessible to the public after the works cease? Will the reinstatement be phased or will it start once the deposit has been exploited?
7. What will happen to the public right of way through the site during and after the works?
8. What detailed conservation proposals are drafted for the reinstatement?
9. The fall off from the deposit slopes towards the marshes within the Broads Authority boundary. There is a natural spring there where there are lots of newts. Will the works alter the hydrostatic fall and affect the Flora and Fauna? ie Devils End Meadow.
10. Will any jobs for locals be generated?
11. Will any plans for waste disposal as part of the reinstatement works be proposed?
12. What operating hours will be proposed for the site (any weekend work)?
13. What pollution controls will be proposed for dust, noise, mud on the road?
14. What upgrades to Crab Apple Lane junction are proposed?

Full text:

1. Where is the detailed plan outlining all areas affected by the exploitation ie areas under potential risk "Devil's End Meadow" by Min25?
2. Where is the site specific plan showing position of the processing plant?
3. What compensation will be offered to properties directly affected by the works?
4. What will the closest proximity of the deposit exploitation be to the boundary of any directly affected property?
5. To what depth will the deposit be extracted to?
6. Will the reinstatement of the site be 100% accessible to the public after the works cease? Will the reinstatement be phased or will it start once the deposit has been exploited?
7. What will happen to the public right of way through the site during and after the works?
8. What detailed conservation proposals are drafted for the reinstatement?
9. The fall off from the deposit slopes towards the marshes within the Broads Authority boundary. There is a natural spring there where there are lots of newts. Will the works alter the hydrostatic fall and affect the Flora and Fauna? ie Devils End Meadow.
10. Will any jobs for locals be generated?
11. Will any plans for waste disposal as part of the reinstatement works be proposed?
12. What operating hours will be proposed for the site (any weekend work)?
13. What pollution controls will be proposed for dust, noise, mud on the road?
14. What upgrades to Crab Apple Lane junction are proposed?