Object

Preferred Options consultation document

Representation ID: 94915

Received: 29/10/2019

Respondent: Mr JJ Gallagher

Representation Summary:

MW2 lists 13 areas that mineral development must not have an unacceptable impact upon. For AOS E and the area of SIL 02 that it still contains all of the impacts listed are present and cannot be mitigated against The bird-strike risk alone highlighted by the MOD (DIO) objection in the Initial Consultation, should be enough to have these areas removed from the M&WLP; however, add the cumulative effect of all the objectives and in any timeframe quarrying in these areas is an unacceptable risk.

Full text:

MW2 lists 13 areas that mineral development must not have an unacceptable impact upon. For AOS E and the area of SIL 02 that it still contains all of the impacts listed are present and cannot be mitigated against The bird-strike risk alone highlighted by the MOD (DIO) objection in the Initial Consultation, should be enough to have these areas removed from the M&WLP; however, add the cumulative effect of all the objectives and in any timeframe quarrying in these areas is an unacceptable risk.