Object
Preferred Options consultation document
Representation ID: 94917
Received: 29/10/2019
Respondent: Mr JJ Gallagher
MW4 - Without forging a robust, advanced clear and flat glass recycling facility here in Norfolk, which would reduce the CO2 emissions from both quarrying and glass manufacturing (more recycled glass used in manufacture reduces CO2 emissions and the energy required), the M&WLP is unsound in not accounting for the reductions that are available but not planned for as set out in MW4.
MW4 - Without forging a robust, advanced clear and flat glass recycling facility here in Norfolk, which would reduce the CO2 emissions from both quarrying and glass manufacturing (more recycled glass used in manufacture reduces CO2 emissions and the energy required), the M&WLP is unsound in not accounting for the reductions that are available but not planned for as set out in MW4.