Object
Preferred Options consultation document
Representation ID: 94919
Received: 29/10/2019
Respondent: Mr JJ Gallagher
Representation Summary:
MW6 - In respect of the remaining ⅓ of SIL 02 that is within AOS E, this objective cannot be met since Sibelco (the company proposing the site) state the site would be restored to a lake and not returned to grade 3 agricultural land. Therefore, AOS E and SIL 02 should be removed from the plan going forward.
Full text:
MW6 - In respect of the remaining ⅓ of SIL 02 that is within AOS E, this objective cannot be met since Sibelco (the company proposing the site) state the site would be restored to a lake and not returned to grade 3 agricultural land. Therefore, AOS E and SIL 02 should be removed from the plan going forward.