Object
Preferred Options consultation document
Representation ID: 95014
Received: 30/10/2019
Respondent: Mr Mark Kiddle-Morris
If this combination of sites were to be allocated and the operators intent to commence extraction from 2020 were realized there would potentially be 2 processing plants and 2 quarry entrances within a very small area. There would also be an increase in HGV movements accessing the B1146 at the same point as the existing operation. The cumulative impact of the 2 adjacent operations would be unacceptable.
Should these sites be allocated the start date should be beyond the finish date of the operation of MIN 12, this may be beyond the plan period. Any planning granted on these sites should condition a speed limit reduction on the B1146
If this combination of sites were to be allocated and the operators intent to commence extraction from 2020 were realized there would potentially be 2 processing plants and 2 quarry entrances within a very small area. There would also be an increase in HGV movements accessing the B1146 at the same point as the existing operation. The cumulative impact of the 2 adjacent operations would be unacceptable.
Should these sites be allocated the start date should be beyond the finish date of the operation of MIN 12, this may be beyond the plan period. Any planning granted on these sites should condition a speed limit reduction on the B1146