Object

Minerals and Waste Local Plan: Pre-Submission Publication

Representation ID: 99116

Received: 09/11/2022

Respondent: Mr Nicholas Downing

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

M25.1 Contrasting with all the sites, the MIN25 will be located central to the village and will have the highest number of residential properties within 250 m of the proposed workings. The other sites have 20 residential properties within a 250 m area. We note this is with the exception of MIN 40 which is an extension of an existing quarry. The extension to MIN40 is a real concern as Haddiscoe could potentially have the same adverse decision and problem with a never-ending workings in the middle of the village and residential area which could desecrate and violate the village. This contradicts the Minerals Strategic Objectives, in particular, MS07 which states "To ensure potential impacts on the amenity of those people living in proximity to minerals developments are effectively controlled, minimised and mitigated to acceptable levels".
Soundness test: Not effective

Attachments: