Object

Minerals and Waste Local Plan: Pre-Submission Publication

Representation ID: 99406

Received: 19/12/2022

Respondent: Haddiscoe Parocial Church Council

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

M25 states "The site will need to be worked without dewatering, unless an Hydrogeological Impact Assessment identifies either no unacceptable Hydrological impacts or appropriate mitigation is identified to ensure no acceptable impact to Hydrogeology"
The site is at the highest point of the village and in close proximity to dwellings. 6.44 states that "mineral development must also ensure that there will be no significant change to the ground water or surface water levels, including monitoring of dewatering operations to ensure on adverse impacts on surrounding water availability and/or the water environment" The excavation will have an unspecified impact on the water tables of the dwellings in the village, which have already been materially impacted by a combination of heavy rainfall and prolonged drought conditions.
This is unsound and ineffective