Question 9: Policy MW6 'Agricultural soils'

Showing comments and forms 1 to 8 of 8

Support

Initial Consultation document

Representation ID: 92070

Received: 13/08/2018

Respondent: Natural England

Representation Summary:

The restoration of land following mineral extraction should not automatically default to agricultural after-use. It would be useful to amend the wording of the second bullet point of the policy to include the other types of after-use that would be considered acceptable including contributing to 'net gain' targets through the creation of new habitats and green infrastructure.

Full text:

The restoration of land following mineral extraction should not automatically default to agricultural after-use. It would be useful to amend the wording of the second bullet point of the policy to include the other types of after-use that would be considered acceptable including contributing to 'net gain' targets through the creation of new habitats and green infrastructure.

Comment

Initial Consultation document

Representation ID: 92102

Received: 10/08/2018

Respondent: Broadland District Council

Representation Summary:

The policy should seek to guide development to the lowest grade of land available, and not lump 3b, 4 and 5 together.

Full text:

General point - it is not necessary or desirable for policies to cross-reference to general policy MW2. There is a danger that if you just refer to MW2 this implies that other policies are not relevant, and other policies (e.g. MW 3 and MW4) that might be equally applicable across a range of specific development types may be overlooked .

MW1 - Presumption in favour of sustainable development. This largely duplicates policy contained in the NPPF. As such it is not necessary and conflicts with plan-making guidelines about duplication. It is suggested that it is deleted, and perhaps reworded into appropriate supporting explanatory text.

MW4 - Climate change mitigation and adaption. The wording of this policy is a little unspecific, through the use of "should" and "minimise" and "endeavour", and potentially conflicts with other regimes such as Building Regulations. It is suggested that it is made clear at the beginning of the policy that measures will be encouraged, or expected, to go beyond normal "national" standards if at all feasible, but that this is not a requirement.

MW6 - Agricultural soils. The policy should seek to guide development to the lowest grade of land available, and not lump 3b, 4 and 5 together.

WP2 - Spatial Strategy for waste management facilities. The meaning of the first sentence is unclear. It is unlikely that anywhere will be within five miles of more than one urban area or main town, and the reference to "at least one" implies that encouragement is being given to serving more than one area which could put the focus on a mid-point that poorly serves all areas.

WP3 - Land uses potentially suitable for waste management facilities
The list of potentially suitable land uses, 'within or adjacent to agriculture and forestry buildings' would appear to open up a wide range of sites to possible consideration, although it is understood that sites would need to meet the requirements of the general policies too. Permitted Development also opens up the scope for new build agricultural buildings, with relatively little input from the local planning authority. Consequently, it is suggested that clause d) be caveated 'appropriately located' and 'in established use'.

WP4, WP5, WP7 etc. - a number of policies refer back to WP3 stating that proposals 'may be acceptable on land within the identified uses in', the Policy would be more effective as 'will not be acceptable outside of land identified in'.

WP7 - Household Waste Recycling Centres. The reference to an "appropriate level of developer contributions from new developments will be sought" goes beyond the remit of the Minerals and Waste Local Plan by seeking to be applied to non - mineral or waste development. As such it would make the plan fail the test of legal soundness. Such a policy might be appropriately located within the local Plan of a local planning authority such as a District Council. An example is policy CSU4 in BDC's Development Management DPD 2015.
It would also be difficult to 'retro-fit' new Household Waste Recycling Centres into identified growth locations, if it was not a requirement when those locations were identified. Consideration could be given to allocating sites in the Minerals and Waste Local Plan which have good access to the growth locations.

WP15 - Whitlingham Water Recycling Centre. The majority of this policy is not worded as policy for land use and development, and would appear to be requests, for example Anglian Water being strongly encouraged to develop a long-term vision, and suggestions for the local liaison group and working relationships. Reference to these matters could perhaps be included in the supporting text with, possibly, the policy requiring the demonstration of how any improvement proposals fit into a long-term vision eg 'Any proposals for the improvement of WWRC must to be accompanied by a longer-term vision, produced in collaboration with ...' as this would likely be a consideration in the determination of any proposals.
As regards the Local Liaison Group, it might be worthwhile inviting other nearby Parish Councils in addition to the ones listed (eg Postwick and Thorpe St Andrew).

WP16 - Design of Waste Management facilities. This overlaps with MW2 and MW3. Therefore, this policy might be better placed in the General Policies part of the Plan, and used to cover waste and minerals proposals.

Comment

Initial Consultation document

Representation ID: 92476

Received: 09/08/2018

Respondent: Sibelco UK Limited

Representation Summary:

This policy should be applied flexibly since minerals can clearly only be worked where they exist and for silica sand for glass making the potential land is further restricted by virtue of the scarcity of this mineral.

Full text:

Question 1: 'Minerals and Waste Local Plan Vision'
The Vision should refer the provision of minerals supply to be in accordance with and as required by National Policy
Mineral Safeguarding should refer to paragraph 182 of the revised National Planning Policy Framework such that the applicant for adjacent development ('agent of change') should be required to provide suitable mitigation to take account of existing and allocated development.

Question 3: 'Minerals Strategic Objectives'
The following amendments are proposed (in CAPITALS):
MSO2. To provide a steady and adequate supply of industrial minerals by identifying adequate mineral extraction sites/areas within Norfolk sufficient to meet the forecast need AND STOCKS OF PERMITTED RESERVES OF SILICA SAND OF AT LEAST 10 YEARS PRODUCTION FOR INDIVIDUAL SILICA SITES AND AT LEAST 15 YEARS FOR SILICA SAND SITES WHERE SIGNIFICANT NEW CAPITAL IS REQUIRED and safeguarding existing infrastructure. (To accord with NPPF 2018 paragraph 208 footnote 68)

MSO4. To safeguard silica sand, carstone, and sand and gravel resources for future use. Avoiding unnecessary sterilisation by encouraging the extraction of minerals prior to other development taking place where practicable and using minerals in construction on the land from which they are extracted. THE 'AGENT OF CHANGE' PRINCIPLE WILL BE APPLIED TO ANY NEW PROPOSED DEVELOPMENT IMPACTING ON SAFEGUARDED AREAS OR SITES.

MSO5. To promote the sustainable transport of minerals by rail, road and water, including the safeguarding of railheads and wharfs for the import of minerals to and export of minerals from Norfolk. THE 'AGENT OF CHANGE' PRINCIPLE WILL BE APPLIED TO ANY NEW PROPOSED DEVELOPMENT IMPACTING ON SAFEGUARDED SITES.

MSO8. To ensure that mineral development addresses and minimises the impacts it will have on climate change by: REDUCING greenhouse gas emissions during the winning, working and handling of minerals, SEEK TO PROVIDE sustainable patterns of minerals transportation, and WHERE POSSIBLE integrating features consistent with climate change mitigation and adaption into the design of restoration and aftercare proposals.
MSO9. To positively contribute to the natural, built and historic environments with high quality, progressive and expedient restoration to achieve a beneficial after use. The after use will protect and enhance the environment, including landscape and biodiversity improvements.

Comment: the restoration of mineral sites can deliver landforms to facilitate different after uses of land, however mineral planning has no role in the after use of itself.

MSO10. WHERE PRACTICAL to increase public access to the countryside and enhance biodiversity through enhancing the amenity value of land when restoring extraction sites.

Question 4: Policy MW1 'Presumption in favour of sustainable development'
This policy is supported including the recognition in the preamble that the three pillars of sustainability have equal standing.

Question 5: Policy MW2 'Development Management Criteria'
Where appropriate AND PRACTICAL, enhancement of the environment would be sought, including, but not exclusively, the enhancement of the Public Rights of Way Network, creation of recreation opportunities and enhancement of the natural, historic and built environment and surrounding landscapes.

Question 6: Policy MW3 'transport'
WHERE PRACTICAL AND REALISTIC measures to reduce car travel to the site by workers and visitors and encourage walking, cycling and use of public transport.

Question 7: Policy MW4 'climate change mitigation and adaption'
b) be planned so as to REDUCE carbon dioxide and methane emissions ON A SITE UNIT BASIS
c) endeavour to SOURCE a minimum of 10 per cent of the energy used on site from decentralised and renewable or low-carbon sources.
d) WHERE PRACTICAL AND RELEVANT to demonstrate the use of sustainable drainage systems, water harvesting from impermeable surfaces and layouts that accommodate waste water recycling
e) WHERE RELEVANT TO take account of potential changes in climate including rising sea levels and coastal erosion
g) incorporate proposals for sustainable travel, including travel plans where PRACTICAL AND appropriate.

Question 9: Policy MW6 'agricultural soils'
This policy should be applied flexibly since minerals can clearly only be worked where they exist and for silica sand for glass making the potential land is further restricted by virtue of the scarcity of this mineral.

Question 27: Policy MP1 'Provision for minerals extraction'
No as it does not accord with National Policy and is unsound. Suggested wording for silica sand:
STOCKS OF PERMITTED RESERVES for silica sand will be maintained at 10 years' PRODUCTION FOR EACH SILICA SAND SITE. Sufficient sites and/or areas to deliver at least 12,380,000 tonnes of silica sand will be allocated TO THE END OF THE PLAN PERIOD WITH FURTHER PROVISION TO ENSURE A STOCK OF PERMITTED RESERVES BEYOND THE PLAN PERIOD.
In the table on page 63 in the preamble to Policy MP1 is should read:
B Silica sand permitted reserve at 31/12/2016

Question 28: Policy MP2 'Spatial strategy for minerals extraction'
"Within the resource areas identified on the key diagram, specific sites or preferred areas for silica sand extraction should be located where they are able to access the existing processing plant and railhead at Leziate via conveyor, pipeline or off-public highway routes". This contradicts wording in proposed Policy MP13 and the Single Issue Silica Sand Review of the Minerals Site Specific Allocations DPD (adopted in December 2017) which discussed highway routes from Areas of Search to the Leziate processing site.
There should be no buffers applied to the so-called planning constraints. The acceptability or not of approaching such constraints will be a matter for the EIA.
Agricultural land grades 1 and 2 should not be excluded. This contradicts Policy MW6 which should in all circumstances be adopted and applied flexibly.

Question 33: Policy MP7 'Progressive working, restoration and after-use'
After use is noted several times in the policy but after use is not a matter for mineral planning.
There is no mention of restoration to agricultural land
Any important geology or geomorphology on the site will be retained in sample exposures for study purposes ONLY WHERE PRACTICAL AND SAFE TO DO SO

Question 36: Policy MP10 'Safeguarding of port and rail facilities, and facilities for the manufacture of concrete, asphalt and recycled materials'
The 'agent of change' principle will be applied to all development in proximity to safeguarded sites.


Question 37: Policy M11 'Mineral Safeguarding Areas and Mineral Consultation Areas'
The 'agent of change' principle will be applied to all development in proximity to safeguarded sites.

Question 67: Proposed Site MIN 40 'land east of Grandcourt Farm, East Winch'
The site is allocated as a specific site for silica sand extraction in the Adopted in the Core Strategy and Minerals and Waste Development Management Policies Development Plan Document 2010-2026 (adopted September 2011) and identified in the Minerals Site Specific Allocations Development Plan Document (DPD) (adopted October 2013, amendments adopted December 2017).

The Initial conclusion on the MIN40 site in the May 2018 consultation document notes that "the site is considered suitable for allocation for silica sand extraction, subject to any planning application addressing the requirements below: [requirements are detailed in the Initial Consultation document]

Sibelco has submitted a planning application for an extension of Grandcourt Quarry into the MIN40 site and has the following comments on some of the "requirements" noted in the Initial Consultation document.

* Opportunities during working for any geodiversity assets to be studied, and if compatible with the landscape and ecology objectives, an open face to be retained as part of the restoration scheme

Sibelco will examine working faces during operation and can take photographic records of any features of note observed, if any. Following extraction being completed in each phase, Carstone material will be used to cover and stabilise the Leziate Sand faces to create safe long term slopes as described in Appendix 9 to the submitted Planning Statement (Geotechnical Design and Assessment).
Opportunities could be afforded during working to geology students to inspect and study open faces and overburden areas under supervision where consistent with health and safety of the site. Bearing in mind the proposed open water restoration with peripheral broadleaved woodland and shrub/grassland it is not been possible to incorporate any open face in the restoration, which would in addition be difficult to maintain safely due to the nature of the geology, which makes it vulnerable to erosion and a potential safety hazard.

* A restoration scheme incorporating heathland or a heathland/arable mix with blocks of woodland which provides biodiversity gains and does not result in permanent dewatering of a perched water table in the carstone aquifer if one is identified in a hydrogeological risk assessment
*
The lodged planning application proposes a combination of restored areas of open water (51.4%), native broadleaved woodland (8.8%), hedgerows (increase of 920 linear metres), scrub & species rich grassland (20.7%), agricultural land (15.2%) and public rights of way for the restored site with biodiversity gains. The hydrogeological assessment of the site showed there were no significant impacts on the perched water table in the Carstone as a result of working and restoration.

The proposed restoration is primarily to water since the excavation will be several metres below the natural groundwater level in order to release the proven mineral. It will not be possible to deliver a dry restoration using on-site overburden materials. For the same reason it will not be possible to deliver a requirement of MIN40, which is to incorporate heathland into the restoration. The proposed site for the former Site Specific Allocations DPD was considerably reduced in area at examination which removed land which may have been suitable for heathland restoration. The much reduced currently allocated area reflects very closely the area of excavation. Once the restored margin areas are accounted for, the remaining area of land restoration is at the lake margins on mostly slopes to the water's edge, which is not suitable for heathland. Significant heathland restoration has been delivered by the Applicant on former mineral sites to the north of Middleton Stop Drain.

The proposed restoration scheme is shown on the submitted restoration drawings. This scheme has been designed with due regard for the precise setting of the site; the local geology; local topography; position of the natural groundwater table and the volumes of different overburden materials identified within the site by drilling programmes.

Policy Min 40 states that a restoration scheme for the site should seek to incorporate heathland or a heathland/arable mix with blocks of woodland which provides biodiversity gains. Given the volumes of sand and overburden materials present and the position of the local groundwater table this is not possible in its entirety in this case.

Sibelco has restored former mineral extraction area locally to heathland (for example Wicken North and Wicken South), however, these areas have very different physical parameters which allowed such restoration to be designed and implemented. Wicken North and Wicken South are located on lower ground and had relatively low sand to overburden ratios which allowed significant areas to be restored to generally level ground above the local groundwater level. Grandcourt Quarry extension is located on higher ground, has a different ratio of sand to overburden (higher ratio) and a different relationship of ground levels to groundwater level. Final restored slopes must be stable in the long term and at the same time utilise only suitable overburden materials from the site (there are no proposals to import any materials from elsewhere to effect the restoration). Tailings materials from the mineral washing (silts and lays) are unsuitable for restoration in this area due to high water content of the tailings and distance from the processing plant. The company has sufficient permitted tailings space elsewhere on the wider site.

The restoration scheme proposed for the extension area in the lodged planning application does include agricultural land, woodland blocks and scrub with a lake of some 9.2 hectares representing the natural groundwater level. The proposed restoration of the MIN40 site reflects the permitted restoration of the existing Grandcourt Quarry site and has been designed to complement and fit in with this overall restoration which is dictated by the geotechnical assessment and local geological circumstances.

The overburden volumes in the Grandcourt extension area and volumes required to restore the site as per the submitted proposed restoration scheme are as follows:

Overburden materials identified by drilling programmes:
Soils 78,000m3
Carstone 1,300,000 m3
Clay 420,000 m3
Material required to create the proposed landform in the MIN40 site:
Material required to create 1:4 slopes on final sand and overburden faces 1,020,000 m3
Material required to create embankment for bridleway and farm access 736,000 m3
Given the material balance for the site as shown above and with no proposal to import any material for restoration or other purposes, the final landform and restoration scheme proposed is the only one which can reasonably be implemented. The MIN40 site is not suitable for heathland restoration.

The submitted Environmental Statement contains a hydrogeological risk assessment which identifies potential impacts on groundwater including the perched water table in the Carstone. The proposed eastern extension will have little or no additional significant impacts to the north, south and west. The area over which drawdown in groundwater levels will occur will increase to the east, but no water sensitive receptors have been identified within the predicted area of influence in this direction. It is proposed that the potential additional impacts to surface and groundwater are monitored and controlled via a minor revision of the existing Water Management Plan.
There is electricity infrastructure within MIN40 site
Subject to the above comments Sibelco supports the inclusion of MIN40 as a Specific Site.

Question 68: Proposed Site SIL 01 'land at Mintlyn South, Bawsey'
Sibelco supports the inclusion of SIL01 as a Specific Site

Question 69: Area of Search AOS E 'land to the north of Shouldham'
Area of Search E
Sibelco supports the inclusion of Area E as an Area of Search for silica sand

Question 73: Policy MP13: 'Areas of Search for silica sand extraction'
Sibelco supports Policy MP13 on Areas of Search for silica sand, subject to our response to Question 9

Question 74: Proposed Site SIL 02 'land at Shouldham and Marham'
Sibelco supports the inclusion of SIL02 as an allocated site and would propose that given the promoters knowledge of the local geology, the site should be allocated as a Specific Site. Further silica sand provision will be required at the end of the Plan period
The National Planning Practice Guidance says:
a) designating Specific Sites - where viable mineral resources are known to exist, landowners are supportive of minerals development and the proposal is likely to be acceptable in planning terms ....

This definition applies to SIL02

Comment

Initial Consultation document

Representation ID: 92502

Received: 13/08/2018

Respondent: Mineral Products Association

Representation Summary:

It should be noted that the industry has shown that Grade 1 land can be successfully restored to equivalent quality and the policy should reflect this or at least referenced in supporting text.
The wording of the policy needs adjusting as follows:

Proposed Changes (new text in CAPITALS)

"Where development is proposed on agricultural land, the County Council has a clear preference for locating new mineral extraction and associated activities, and composting facilities, on land of agricultural grades 3b, 4 and 5.
Development proposals affecting Grade 1 agricultural land will only be permitted in exceptional circumstances, where it is demonstrated that there are no alternative locations for the development.
In addition to the above, when minerals development, particularly extraction, is proposed on agricultural land of grades 1, 2 or 3a it will [delete only] be permitted where:
* Provision is made for high standards of soil management that would enable restoration to a condition at least as good as its previous agricultural quality. To demonstrate this, soil and land quality surveys, and soil handling and replacement strategies (based upon Defra's 'Good Practice Guide for Handling Soils') must be submitted to the County Planning Authority"

* The benefit of restoring the land to another after-use can be shown to outweigh the loss of the agricultural use of the land. [delete all of this bullet point]

The NPPF does not require that exceptional circumstances need to be shown for best and versatile land to be worked. Furthermore, minerals can only be worked where they exist.

Full text:

Question 1: 'Minerals and Waste Local Plan Vision'
Comment:
We agree with the principle of the vision but suggest change in wording to make clear to the lay reader that there is a statutory duty on Norfolk CC re the supply of aggregates. Suggested wording below;

Proposed Changes (new text in CAPITALS)
Norfolk will continue to be self-sufficient in the production of sand & gravel, whilst making an important contribution to the national production of silica sand. A steady and adequate supply of minerals to support sustainable economic growth will be planned for through allocating sufficient sites and/or areas in the Plan to meet the forecast need for sand and gravel, carstone, and silica sand AS REQUIRED BY NATIONAL POLICY.

In respect of the safeguarding vision mention should be made of the agent of change now in the revised NPPF (para 182);

Proposed Changes (new text in CAPITALS)
Resources of sand and gravel, carstone and silica sand within defined Mineral Safeguarding Areas will be safeguarded from needless sterilisation by non-mineral development. Infrastructure for the storage, handling, processing and transportation of minerals will also be safeguarded from incompatible development. THE 'AGENT OF CHANGE' PRINCIPLE WILL BE APPLIED TO ANY NEW PROPOSED DEVELOPMENT IMPACTING ON SAFEGUARDED AREAS OR SITES.

Question 3: 'Minerals Strategic Objectives'
The following adjustments are suggested to the following objectives;

Proposed Changes (new text in CAPITALS)
MSO2. To provide a steady and adequate supply of industrial minerals by identifying adequate mineral extraction sites/areas within Norfolk sufficient to meet the forecast need AND STOCKS OF PERMITTED RESERVES OF SILICA SAND OF AT LEAST 10 YEARS PRODUCTION FOR INDIVIDUAL SILICA SITES OR AT LEAST 15 YEARS WHERE SIGNIFICANT NEW CAPITAL IS CAPITAL IS REQUIRED and safeguarding existing infrastructure.

MSO4. To safeguard silica sand, carstone, and sand and gravel resources for future use. Avoiding unnecessary sterilisation by encouraging the extraction of minerals prior to other development taking place where practicable and using minerals in construction on the land from which they are extracted. THE 'AGENT OF CHANGE' PRINCIPLE WILL BE APPLIED TO ANY NEW PROPOSED DEVELOPMENT IMPACTING ON SAFEGUARDED AREAS OR SITES.

MSO5. To promote the sustainable transport of minerals by rail, road and water, including the safeguarding of railheads and wharfs for the import of minerals to and export of minerals from Norfolk. THE 'AGENT OF CHANGE' PRINCIPLE WILL BE APPLIED TO ANY NEW PROPOSED DEVELOPMENT IMPACTING ON SAFEGUARDED SITES.

MSO10. WHERE PRACTICAL increase public access to the countryside and enhance biodiversity through enhancing the amenity value of land when restoring extraction sites.


Question 4: Policy MW1 'Presumption in favour of sustainable development'
This policy is supported. We also welcome the recognition in the preamble that the 3 pillars of sustainability have equal standing.

Question 5: Policy MW2 'Development Management Criteria'
MW2 (b) needs redrafting as it is unclear.
The last paragraph need adjusting as follows;
Proposed Changes (new text in CAPITALS) Where appropriate AND PRACTICAL, enhancement of the environment would be sought, including, but not exclusively, the enhancement of the Public Rights of Way Network, creation of recreation opportunities and enhancement of the natural, historic and built environment and surrounding landscapes.


Question 6: Policy MW3 'transport'
Suggested altered wording for the last bullet point of the policy as follows;
Proposed Changes (new text in CAPITALS) WHERE REALISTIC AND PRACTICAL measures to reduce car travel to the site by workers and visitors and encourage walking, cycling and use of public transport.
This alteration is made to prevent a dogmatic approach being taken. We have examples of cycle racks needing to be provided when it was clearly impractical for individuals to safely cycle to the site


Question 7: Policy MW4 'climate change mitigation and adaption'
MW4(g) should be reworded as follows;
Proposed Changes (new text in CAPITALS) g) incorporate proposals for sustainable travel, including travel plans where PRACTICAL AND appropriate

Question 9: Policy MW6 'agricultural soils'
It should be noted that the industry has shown that Grade 1 land can be successfully restored to equivalent quality and the policy should reflect this or at least referenced in supporting text.
The wording of the policy needs adjusting as follows:

Proposed Changes (new text in CAPITALS)
Policy MW6: Agricultural soils
Where development is proposed on agricultural land, the County Council has a clear preference for locating new mineral extraction and associated activities, and composting facilities, on land of agricultural grades 3b, 4 and 5.
Development proposals affecting Grade 1 agricultural land will only be permitted in exceptional circumstances, where it is demonstrated that there are no alternative locations for the development.
In addition to the above, when minerals development, particularly extraction, is proposed on agricultural land of grades 1, 2 or 3a it will [delete only] be permitted where:
* Provision is made for high standards of soil management that would enable restoration to a condition at least as good as its previous agricultural quality. To demonstrate this, soil and land quality surveys, and soil handling and replacement strategies (based upon Defra's 'Good Practice Guide for Handling Soils') must be submitted to the County Planning Authority; or

* The benefit of restoring the land to another after-use can be shown to outweigh the loss of the agricultural use of the land. [delete all of this bullet point]
The NPPF does not require that exceptional circumstances need to be shown for best and versatile land to be worked. Furthermore, minerals can only be worked where they exist.

Question 27: Policy MP1 'Provision for minerals extraction'
No as it does not accord with National Policy and is unsound. Suggested re wording as follows;

Proposed Changes (new text in CAPITALS)

Policy MP1: Provision for minerals extraction
The strategy for minerals extraction is to allocate sufficient sites to meet the forecast need for both sand & gravel and hard rock (carstone).
For sand and gravel, specific sites to deliver at least 23,063,560 tonnes of resources will be allocated. The sand and gravel landbank will be maintained at A LEVEL OF AT LEAST 7 YEARS INCLUDING AT THE END OF THE PLAN PERIOD (excluding any contribution from borrow pits for major construction projects).
For carstone, a site or sites to deliver at least 480,000 tonnes of resources will be allocated. The landbank for carstone will be maintained at a LEVEL OF AT LEAST 10 years' supply.
For silica sand, sufficient sites and/or areas to deliver at least 12,380,000 tonnes of silica sand will be allocated. STOCKS OF PERMITTED RESERVES for silica sand will be maintained at "at least" 10 years' PRODUCTION FOR EACH INDIVIDUAL SILICA SAND SITE OR AT LEAST 15 YEARS WHERE SIGNIFICANT NEW CAPITAL IS CAPITAL IS REQUIRED.

We would seek clarification "why it is considered appropriate" (page 63, para1) for basing silica sand projections at 750,000 tpa when the current projections indicate average production over the past 3 years (785,400tpa) is much higher than the 10-year average and the figure upon which the plan projection is based. Basing a figure which is clearly lower than current sales is hardly forecasting (page 65). Further, para 2 on page 63 suggests that no planning applications for silica sand extraction have been submitted for over 10 years, although it is understood that a recent application has yet to be validated by the Council.

With less than 4 years "stocks of permitted reserves" of silica sand, the supply issues are clearly critical.


Question 28: Policy MP2 'Spatial strategy for minerals extraction'
There should be no buffers applied to the so-called planning constraints. The acceptability or not of approaching such constraints will be a matter for the EIA.
It is not clear what the term 'are least constrained' means it the last sentence of the policy and the sentence does not make sense.

Question 33: Policy MP7 'Progressive working, restoration and after-use'
The following alterations are proposed to the policy;
Proposed Changes (new text in CAPITALS)

Proposals for new mineral workings must be accompanied by a scheme for the phased and progressive working and restoration of the site throughout its life.
Restoration and after-use of mineral extraction sites and associated development will be determined on a case-by-case basis, prioritising the most appropriate after-use(s) for each site. Restoration and after-use proposals may include agriculture, forestry, ecology, reservoirs, amenity or flood alleviation.
Preference will be given to after-uses and restoration that:
* enhance Norfolk's biodiversity (focussing on priority habitats and species in Norfolk),
* contribute positively to identified Green Infrastructure corridors, and
* create high-quality, locally distinctive landscapes
* RESTORATION TO AGRICULTURAL LAND.

The after-use and restoration proposal must demonstrate that:
* The appropriate restoration and after-use is both feasible and achievable in the proposed time scales.
* Due consideration has been given to opportunities to improve public access, particularly to implement the County Council's Rights of Way Improvement Plan.
* Due consideration has been given to supporting the aims of the Green Infrastructure Strategy.
* Any important geology or geomorphology on the site will be retained in sample exposures for study purposes ONLY WHERE PRACTICAL AND SAFE TO DO SO.


Question 36: Policy MP10 'Safeguarding of port and rail facilities, and facilities for the manufacture of concrete, asphalt and recycled materials'
The wording should be adjusted as follows to 'apply the agent' of change principle;

Proposed Changes (new text in CAPITALS)
"The County Council will safeguard:
a)Existing, planned and potential rail heads, rail links to quarries, wharfage and associated storage, handing and processing facilities for the bulk transport by rail, sea or inland waterways of minerals, including recycled, secondary and marine-dredged materials; and
b) Existing, planned and potential sites for concrete batching, the manufacture of coated materials, other concrete products and the handling, processing and distribution of PRIMARY, substitute, recycled and secondary aggregate material.
Development proposals within 250 metres of the above minerals related facilities should demonstrate that they would not prevent or prejudice the use of those facilities. THE 'AGENT OF CHANGE' PRINCIPLE WILL BE APPLIED TO ALL SUCH DEVELOPMENT.
The Mineral Planning Authority should be consulted on all development proposals within Minerals Consultation Areas, except for the excluded development types set out in Appendix 4.
The County Council will oppose development proposals which would prevent or prejudice the use of safeguarded sites for those purposes unless suitable alternative provision is made, or the applicant demonstrates that those sites no longer meet the needs of the aggregates industry.

Question 37: Policy M11 'Mineral Safeguarding Areas and Mineral Consultation Areas'
Wording of the policy should be altered to incorporate the 'agent of change' principle as follows;
Proposed Changes (new text in CAPITALS)
The County Council will safeguard existing, permitted and allocated mineral extraction sites from inappropriate development proposals. Minerals Consultation Areas are delineated on the Policies Map and extend to 250 metres from each safeguarded site. Development proposals within 250 metres of a safeguarded site should demonstrate that they would not prevent or prejudice the use of the safeguarded site for mineral extraction, AND THE AGENT OF CHANGE PRINCIPLE WILL BE APPLIED IN ALL SUCH CASES. The County Council will object to development proposals which would prevent or prejudice the use of safeguarded sites for mineral extraction.

Other Comment
Section 42. Page 84...The Targets/trigger levels do not conform with land bank policy requirements or those for stock of permitted reserves, wither in the proposed Policy MP1 or the NPPF.

Comment

Initial Consultation document

Representation ID: 92517

Received: 13/08/2018

Respondent: South Norfolk District Council

Representation Summary:

MW6 - would be more effective if it set out a hierarchy that sought development on the lowest grade of agricultural land first.

Full text:

Thank you for your recent consultation on the above document, South Norfolk Council has the following comments to make.

General comments regarding the format of the policies:
Several policies concerning particular development types refer back to 'General' Policy MW2; whilst the reason for this is understood, there are a number of other general policies (e.g. MW3 and MW4) that might be equally applicable across a range of development types, but may get overlooked when development specific policies just refer back to MW2. As the policies in the plan should be read as a whole, is it necessary to have the references back to the general Development Management policies?
In a number of places policies are worded as aspirations, rather than requirements, consideration should be given to moving such wording to the supporting text, or strengthening the wording in the policy itself.

Comments on specific policies:

MW6 - would be more effective if it set out a hierarchy that sought development on the lowest grade of agricultural land first.

WP2 - it is not entirely clear what the first part of this policy is seeking to achieve; if it is seeking sustainable locations within easy reach of centres of population (particularly those that the proposed facilities are serving), the text may need to be expanded to better reflect this.

WP3 - in the list of potentially suitable land uses, 'within or adjacent to agriculture and forestry buildings' would appear to open up a wide range of sites to possible consideration, although it is understood that sites would need to meet the requirements of the general policies too. Permitted Development also opens up the scope for new build agricultural buildings, with relatively little input from the local planning authority. Consequently, could clause d) be caveated 'appropriately located' and 'in established use'?

WP4, WP5, WP7 etc. - a number of policies refer back to WP3 stating that proposals 'may be acceptable on land within the identified uses in', the Policy could be more effective as 'will not be acceptable outside of land identified in'.

WP7 - Concerned that this may not be legally sound, in that it goes beyond the remit of the Minerals and Waste Local Plan by seeking developer contributions. It would also be difficult to 'retro-fit' new Household Waste Recycling Centres into identified growth locations, if it was not a requirement when those locations were identified. Consideration could be given to allocating sites in the Minerals and Waste Local Plan which have good access to the growth locations.

WP15 - elements of this policy would appear to be requests rather than requirements, for example could 'strong encouragement' to Anglian Water be included in the supporting text, and the policy be reworded to say, 'Any proposals for the improvement of WWRC must to be accompanied by a longer-term vision, produced in collaboration with ...'

WP16 - This seems to overlap with MW2 and MW3; therefore, would this policy be better placed in the General Policies part of the Plan, and used to cover waste and minerals proposals?

Comments on Proposed Minerals Extraction Sites:

MIN25 at Haddiscoe - the site is very close to the nearest dwelling and the village generally, it would seem to be quite a significant site in terms of volume of material to be extracted, number of lorry movements etc. (we note there is a balance to be struck between length of extraction time and daily vehicle movements, to address concerns raised by the previous refusal of permission). Is there any scope to reduce the extent of the site, moving the boundary away from nearby dwellings and/or phasing the extraction as part of any mitigation? This, along with the impact on the Grade I Listed church and the visual impact of the proposed bunding, was a concern that South Norfolk Council raised in respect of the previous application on this site. In addition, the landscape assessment refers to mature screen planting, it would be useful if retention of this was picked up in the Initial Conclusion.

MIN 212 at Mundham - The relationship between the site and the processing plant seems to be quite poor, although it is acknowledged that the number of movements are relatively small and this is an existing route. The proposal includes increased bunding to screen the minerals workings, but doesn't indicate if that would be acceptable in terms of the landscape character type within which the site is located.

I hope you find the above comments useful.

Object

Initial Consultation document

Representation ID: 92539

Received: 10/08/2018

Respondent: Mr G Parker

Representation Summary:

In view of the recent scorching weather, and news that farmers will be under stress for years to come trying to provide for an ever increasing population, I must ask if this is really the time to commandeer so much agricultural land for building materials, when it will be at such a premium for its Primary Purpose?

I must add, however that I am amazed that so much PRODUCTIVE land can be sacrificed in this way. The recent weather has changed the news, and the future looks bleak enough, and even worse if the bread basket of East Anglia is to be swallowed by solar farms and extraction sites.

Full text:

In view of the recent scorching weather, and news that farmers will be under stress for years to come trying to provide for an ever increasing population, I must ask if this is really the time to commandeer so much agricultural land for building materials, when it will be at such a premium for its Primary Purpose?
Further to my earlier email, and our telephone conversation, I am very concerned about the noise pollution which will inevitably accompany an extraction site within 250 metres of my house.
I must add, however that I am amazed that so much PRODUCTIVE land can be sacrificed in this way. The recent weather has changed the news, and the future looks bleak enough, and even worse if the bread basket of East Anglia is to be swallowed by solar farms and extraction sites.

Support

Initial Consultation document

Representation ID: 93021

Received: 10/08/2018

Respondent: Brett Group

Agent: Heaton Planning Ltd

Representation Summary:

Policy MW6 is supported. The final bullet point of Policy MW6 state, 'the benefit of restoring the land to another after-use can be shown to outweigh the loss of the agricultural use of the land.' This is supported and in accordance with NPPF. However, this approach needs to be reflected in strategic objective MSO9 which requires landscape and biodiversity improvements, this cannot always be the case, MSO9 should be amended to reflect Policy MW6.

Full text:

Representations submitted on behalf of the Brett Group.
Section 3 - The process so far
Section 3 sets out the methodology for site assessments - including landscape, ecology, highways etc.
For Historic Environment and Archaeology:
* Details of known assets
* Proposals for protection / mitigation
* Support from Norfolk County Council's Historic Environment Service and whether this is dependent on appropriate protection / mitigation.
For Sustainability Appraisal:
* Ensures that potential environmental effects are given full consideration alongside social and environmental issues.
* Sustainability appraisal an integral element of the preparation of the MWLP review ... informing in a comprehensive way of the likely impacts of proposed planning policies and specific sites / preferred areas and areas of search.
What is not clear from the methodology is the balance applied to the impacts alongside the economic and social benefits. The revised NPPF (2018) is clear at Chapter 2 that achieving sustainable development means that the planning system has three overarching objectives, economic, social and environmental, which are interdependent and need to be pursued in mutually supportive ways (so that opportunities can be taken to secure net gains across each of the different objectives). Para 32 of NPPF (2018) states:
Local plans and spatial development strategies should be informed throughout their preparation by a sustainability appraisal that meets the relevant legal requirements. This should demonstrate how the plan has addressed the relevant economic, social and environmental objectives (including opportunities for net gains). Significant adverse impacts on these objectives should be avoided and, where possible, alternative options which reduce or eliminate such impacts should be pursued. Where significant adverse impacts are unavoidable, suitable mitigation measures should be proposed (or, where this is not possible, compensatory measures should be considered).
The methodology does not clearly provide a balance of the impacts - a number of sites clearly have numerous environmental sensitivities but do not constitute an objection on their own right. There should be some consideration of the cumulative impact of such effects.

Section 6 - The Strategy - Vision and Objectives
Question 1: 'Minerals and Waste Local Plan Vision'
We have the following comments and suggestions to make:
Minerals and Waste Local Plan Vision to 2036:
3rd para - All mineral workings will be covered by progressive restoration schemes
This is not in accordance with para 205 of the NPPF (2018) which recommends restoration should be at the earliest opportunity. It is not always possible to put in place a progressive restoration scheme, we recommend the wording is amended to be in accordance with NPPF.
7th para - Minerals development and waste management facilities will be located, designed and operated without adverse impacts on the amenity of local communities, the natural, built and historic environment, the landscape and townscape of Norfolk.
This is unreasonable, it would be very difficult for a mineral operation not to have some form of adverse impact, it is the degree of impact which is important. Para 204(f) of the NPPF (2018) seeks to ensure that permitted operations do not have an unacceptable adverse impact. This is reiterated within para 205 (c) of the NPPF (2018). We recommend the wording is amended to be in accordance with NPPF.

Draft Minerals Strategic Objectives
Question 3: 'Minerals Strategic Objectives'
We have the following comments to make:
MSO4 - requiring the justification for the potential sterilisation of minerals from competing development interests is supported.
MSO6 - the adverse impacts should be amended to unacceptable adverse impacts to conform with NPPF.
MSO7 - para 204(g) of the NPPF (2018) recognises that some noisy short term activities, which may otherwise be regarded as unacceptable, are unavoidable to facilitate minerals extraction. MSO7 should be reworded to conform with NPPF.
MSO8 - could you provide some clarification on 'providing for sustainable patterns of minerals transportation'. As is stated on page 29 of the consultation document the majority of minerals and waste sites in Norfolk are served by Heavy Goods Vehicles, with the majority of bulk materials likely to continue being transported by road as this is currently the most feasible mode of transport. We do not believe Objective MS08 is deliverable.
MSO9 - a mineral operator cannot always guarantee a positive contribution to natural, built and historic environment, particularly when the operator does not own the land with the landowner seeking different aspirations. The objective should be to seek to positively contribute.
MSO10 - we do not consider this objective to be deliverable as an operator cannot be in a position to increase public access for every restoration scheme. The objective should be to seek to increase public access.

Section 7 - Presumption in favour of sustainable development
Question 4: Policy MW1
Policy MW1 - 1st bullet should be unacceptably adverse, to conform with NPPF and reflect the advice within Section 8 of the Consultation Document, page 25, 4th paragraph.

Section 8 - Development management criteria
Question 5: Policy MW2
Policy MW2 is supported - the policy is in line with NPPF, in particular the final requirement on restoration recognising that environmental enhancements sought where appropriate. However, this is contrary to the earlier Vision and Objectives. The Vision and Objectives should be amended to seek conformity throughout the plan and with NPPF.

Section 12 - Agricultural soils
Question 9: Policy MW6
Policy MW6 is supported. The final bullet point of Policy MW6 state, 'the benefit of restoring the land to another after-use can be shown to outweigh the loss of the agricultural use of the land.' This is supported and in accordance with NPPF. However, this approach needs to be reflected in strategic objective MSO9 which requires landscape and biodiversity improvements, this cannot always be the case, MSO9 should be amended to reflect Policy MW6.

Section 15 - Land uses potentially suitable for waste management facilities
Question 12: Policy WP3
Policy WP3 identifies that waste management facilities at exiting mineral workings and landfill sites may be considered acceptable on a temporary basis with planning permission restricted to a cessation date for the mineral operation or landfill activities. We consider that greater flexibility should be provided within the Policy - there can be occasions when it is appropriate to retain a facility, for example recycling, that can benefit from the retention of infrastructure and continue to serve the markets established. We recommend Policy WP3 should provide greater flexibility and be amended accordingly.

Section 16 - Recycling or transfer of inert and construction, demolition and excavation waste.
Question 13: Policy WP4
As with Policy WP3, Policy WP 4 seeks to restrict waste management operations to the life of the mineral operation. We do not consider that this is always necessary or appropriate and recommend that Policy WP4 is less restrictive.

Section 23 - Disposal of inert waste by landfill
Question 20: Policy WP11
Policy WP11 is supported and could be extended by including the importation of inert waste where it is necessary for agricultural improvement.

Section 30 - Provision for minerals extraction
Question 27: Policy MP1
NCC propose to use the last 20 years average of 1.98mtpa rather than the 10 year average of 1.41mtpa. The justification for this is to enable a sufficient quantity of sand and gravel resources to be available over the 20 year plan period and would take into account potential fluctuations in the economy. This positive approach to securing a steady and adequate supply of aggregates is supported.
Policy MP1 - provision for minerals extraction including the need to allocate 23,063,560 tonnes of sand and gravel is supported. However, to be in accordance with NPPF, the policy should be amended so that it provides a sand and gravel landbank of at least 7 years.

Section 31 - Spatial strategy from minerals extraction
Final para of page 66 states:
... Norfolk's urban areas and main towns are the locations where there will be the greatest need for a supply of aggregate for new housing development and associated infrastructure.
Policy MP2: Spatial Strategy for mineral extraction
Within the resource areas identified on the key diagram, specific sites for sand and gravel ... should be located within 10 miles of one of Norfolk's urban areas or main towns and/or be well related to one of Norfolk's urban areas or main towns via appropriate transport infrastructure.
Within the listed settlement hierarchy Great Yarmouth is in the highest tier as an urban area. This being the case we question the Council's approach to allocate one site within 10 miles of the Great Yarmouth urban area. We do not believe this secures a steady and adequate supply of sand and gravel to the Great Yarmouth area and the Council should be allocating additional reserves. These additional reserves should be secured through the allocation of land at MIN38 - Waveney Forest, Fritton.

Section 33 - Agricultural or potable water reservoirs
Question 30: Policy MP4
Policy MP4: Agricultural or potable water reservoirs is supported.

Section 34 - Core River Valleys
Question 31: Policy MP5
Policy MP5 seeks protection to the Core River Valleys that is over and above the protection offered in the NPPF to sites of national landscape and biodiversity importance. The policy should be caveated with 'So far as is practicable minerals development will be permitted ...' removing the word 'only'.

Section 36 - Progressive working, restoration and aftercare
Question 33: Policy MP7
Policy MP7 is supported - it provides a balance in seeking progressive working, enhancements to landscape / biodiversity but is not mandatory. This is in contrast to some of the earlier policies and strategic objectives, such as MSO10.

Section 38 - Concrete batching and asphalt plants
Question 35: Policy MP9
Policy MP9 limits the use to the life of the quarry, it is sometimes beneficial to retain the use of ancillary facilities after the mineral operation has been completed making full use of a developed access and transport links, and facilitating an existing market.

PROMOTION OF MIN 38 - WAVENEY FOREST, FRITTON
In a response to Norfolk County Council's 'Call for Sites' a comprehensive submission was made on behalf of the Brett Group promoting land at Waveney Forest, Witton. The submission included a detailed assessment of the potential environmental and amenity impacts that may arise from the development of a new sand and gravel quarry at Fritton.
Part 2 of the Consultation Document undertaken by the County Council concurs with the findings of the Call for Sites report submitted by Brett in August 2017, with exception of Heritage interests. Part 2 of the Consultation Document states:
Historic environment: The historic landscape character of the site is 18th to 20th Century plantation woodland. The site is within a wider historic landscape character of 20th century agriculture with enclosure, boundary loss and boundary loss with a relict element; pastoral farming, and agriculture with 18th to 19th century piecemeal enclosure. The wider historic landscape character also includes modern built up areas of linear settlements, small farm clusters, nucleated clusters and urban development; and drained reclaimed enclosed land (rectilinear enclosure from 19th to 20th century). The wider historic landscape character also includes drained enclosed rectilinear grazing marsh (17th to 20th century enclosure), a historic earthwork, leisure/recreation, informal parkland, sea defences, saltings, a reservoir and woodland (18th to 19th century plantation woodland, carr woodland and regenerated alder carr woodland).
The nearest Listed Building is the Grade II* Drainage Pump which is 260m away. There are 20 Listed Buildings within 2km of the site. There are two locally listed heritage assets within the site, the remains of a WW2 firing range and a concrete railway bridge, although these are not within the proposed extraction areas. The nearest Scheduled Monument is St Olave's Priory, which is 390m away. There are 2 Scheduled Monuments within 2km of the site. Halvergate Marshes Conservation Area is adjacent to the site boundary and Haddiscoe Conservation Area is 330m from the site. There are no Registered Historic Parks and Gardens within 2km of the site. A planning application for mineral extraction at this site would need to include a Heritage Statement to identify heritage assets and their settings, assess the potential for impacts and identify appropriate mitigation measures if required.
Archaeology: This site could reveal nationally important remains for early and middle Pleistocene early human settlements in NW Europe, perhaps linking to finds at Norton Subcourse and Pakefield (in Suffolk). There are Historic Environment records of features in the site most of which are linked to a WW2 military site possibly a training site, within the site boundary. The proposer of the site has indicated two extraction areas within the wider site area; neither the local listed features (remains of a WW2 firing range, and a former railway bridge) are within these extraction areas. A number of undesignated heritage assets have been provisionally identified which may be linked to the WW2 training area. The site is currently a commercial forestry plantation within which felling operations take place, which involve the use of heavy vehicles and earth moving operations. These operations may have degraded the undesignated heritage assets, although good practice for tree felling operations states that archaeological features should be protected. Therefore, an assessment of the significance of archaeological deposits will be required at the planning application stage, in order to protect and mitigate the impact of mineral extraction in this site. However, the Norfolk Historic Environment Service have stated that they consider that no appropriate mitigation or modification of the site would be able to prevent harm to the
undesignated heritage assets which as a whole make up the significance of the WW2 training area, of which few examples remain.
The final few sentences of the extract have been underlined because they clearly contradict one another. We believe that the site is able to be developed for quarrying purposes. Within the submission by Brett for the Call for Sites a detailed heritage appraisal was undertaken - a summary of the report is provided below:
Direct Impacts on Heritage Assets - The site is known to contain military structures dating from WWI and predominantly WWII. Some of these are solidly engineered in concrete, whilst the majority are understood to be of more flimsy construction making use of wood, chicken wire and corrugated iron.
The PAA may also retain earlier archaeology, in particular from the later prehistoric period.
In the past 5 years tree felling has occurred across approximately 60% of the proposed extraction areas. This has involved heavy machinery, including evidence of some ground reduction caused by the windrowing of the wastage. The damage caused to archaeology, both military and earlier, could not be quantified on the site visit, but it is considered that it could be significant.
Should this site be allocated, a thorough survey should be carried out using GPS and photography to create a catalogue of archaeology. Some archaeological evaluation may be required. This would allow an assessment of the distribution, form, condition and significance of all archaeology within the PAA.
Opportunities - Any future planning application would require a mitigation strategy to manage the archaeological resource. This would involve a combination of preservation in situ, excavation and recording.
The majority of the military structures identified in the 2009 survey by Warner and Wilby lie outside or on the periphery of the proposed extraction areas and preservation in situ of these outliers should be the objective.
These were only temporary structures and in time they will inevitably decay and collapse through natural processes. Excavation and recording of a selection of structure types within the extraction areas would be an important contribution to our understanding of how they were constructed and operated.
Consideration should be given to the consolidation of some of the military remains to ensure their preservation for the future. There is also potential to create an educational resource, based around any consolidated structures should the restoration concept permit, that would be an important public benefit.
This approach has been adopted elsewhere, for example at Binnegar Quarry, Dorset where an auxiliary bunker has been archaeologically excavated and the results will form the focus of a display in an on-site education centre recounting the history of the Auxiliary Units in Dorset
The Heritage Appraisal reaches the following conclusion:
"On current evidence, there are no overriding constraints to the allocation of this site and, from an archaeological and heritage perspective and subject to appropriate mitigation, the proposals provide opportunities for educational benefit and conform to national planning policy and guidance."
The current Consultation Documents produced by the County Council acknowledge that:
* no local listed feature falls within the proposed extraction area;
* the site is commercial forestry plantation within which felling operations take place, which involve the use of heavy vehicles and earth moving operations;
* commercial forestry operation may have degraded the undesignated heritage assets;
* further archaeological assessment work will be required.
No recognition has been given, by the County Council, to the potential opportunity that could arise from a quarry development to allow for proper archaeological assessment whilst providing opportunities through a considered restoration.
We have some concerns with the Sustainability Appraisal scoring for land at Waveney Forest, Fritton:
SA1 - It is unclear why some sites score more positively than others when they are similar distances to main towns. Why has a score of '+' rather than '++' been given? The site is in close proximity to two urban areas / main towns, Great Yarmouth and Gorelston on Sea.
SA5 - We have concerns that the evaluation within the SA is not taken forward to the assessment within Part 2 of the Consultation Document. Sites with known heritage interests in close proximity are proposed for allocation with no clear indication on mitigation. Further to our comments above, the proposals for Waveney Forest do not have any impact on any designated asset. There is no justification for a score of '- -' post extraction on the site. Brett have offered a restoration scheme that would build on the heritage interest in the area and provide beneficial opportunities. This has not been recognised in any of the assessment documents produced by the County Council to date.
SA8 - why has a '-' score been applied when it is acknowledged that there will be no impact upon any designated landscape and the existing woodland will screen the proposed development.
SA11 - a score of '++' should be applied due to the proximity of Great Yarmouth and Gorleston on Sea and the lack of other allocated sites in closer proximity.
The site is located approximately 9km from Great Yarmouth, the adopted Core Strategy1 identifies that this is one of three 'major built up areas'2 in Norfolk. The Core Strategy sets out a 'locational preference' to potential site allocations which are 'close and/ or well related' to the Great Yarmouth Urban Area. This is such a site and it is understood by the promoter to be the closest land-won aggregate site to Great Yarmouth with reserves throughout the Plan period. Furthermore, there are no other extraction operations within the immediate vicinity which would lead to consideration of cumulative effects.
1 The Core Strategy and Minerals and Waste Development Management Policies Development Plan Document 2010-2026
2 Paragraph 2.3 adopted Core Strategy
The main impact of the proposals relates to heritage interest and potential for structures from WW1 and WW2. These were predominantly temporary structures (for example constructed of timber, chicken wire, corrugated iron and sandbags) and that the cycle of forestry planting and felling will likely destroy or significantly affect these remains. Mineral extraction offers an opportunity to survey, excavate archaeologically and record, as well as consolidating and preserving some in situ for future generations.
By adopting the approach preferred by Brett and the landowner, the site will be able to offer opportunities for creating ecological habitats that are more in keeping with the local environment including woodland, wetland / wet woodland on restoration. In addition to long term habitat creation and protection, the wider benefits will be derived from the development through comprehensive restoration includes opportunities for public access and interpretation of heritage assets.
The public benefit derived from these proposals outweigh the potential damage, se set out in NPPF.
It is therefore submitted that the site represents an ideal opportunity for allocation for sand and gravel extraction as part of the Norfolk Minerals and Waste Local Plan Review.
I trust that the above comments are helpful. Should you have any queries or wish to discuss any of the points raised in more detail, please do not hesitate to contact us.

Comment

Initial Consultation document

Representation ID: 93165

Received: 20/07/2018

Respondent: Broads Authority

Representation Summary:

Does MW6 repeats MW2?
See previous comment about peat. Should peat be mentioned in this policy?

Full text:

Today Planning Committee endorsed the response below to the Norfolk Minerals and Waste Local Plan Issues and Options consultation.

I hope this is helpful and I am happy to clarify any points if needed.


Main document
* The Broads has been identified by Historic England as an area with exceptional potential for waterlogged archaeology. Any excavation within or close to the executive area will require particularly robust archaeological evaluation prior to consenting and not rely on a brief desk based evaluation and conditions.
* For the avoidance of doubt, perhaps say that this covers the entire county of Norfolk.
* Perhaps something about how it fits with our Local Plans? Something about how Authorities consulted if application in or near to area? We would like to understand how our special qualities and our policies that could be of relevance would be considered in decision making.
* Page 16, 28 - the Broads has a status equivalent to a national park.
* Page 23 - suggest A3 landscape.
* Page 28: Typographical error: 'Landscape Character Assessments have been carried by the Local Planning Authorities in for Norfolk and they consider where locally designated landscapes of importance are situated'.
* Page 39: Typographical error: 'and/or the volumes of waste in each area so low that it would be unviable for a full range of waste management facilities to exist in every area'.
* Page 41: Typographical error: 'end-of-live vehicles' - should this be 'life'?
* Page 46: Typographical error: '...have similar locational requirements due to their potential to impact on local amenity and the environmental'.
* Page 49: Typographical error: 'of waste electronic electrical and electronic equipment (WEEE)'
* WP17 and MP10 and MP11 - will you provide GIS layers of these facilities and consultation zones?
* Page 61: Typographical error: 'the most recently available date'
* The areas on page 67 - the Broads is not mentioned. Presumably this is because silica sand only occurs in West Norfolk Borough?
* Page 77: Typographical error: 'will be made by on a case by case basis'.
* Page 78: Typographical error: 'Carstone is also a scare resource in Norfolk and therefore it is appropriate for the entire carstone resource to be safeguarded as part of the MSA'
* Page 78 - reference to peat. Whilst extraction is not supported in the NPPF, what about the removal of peat as part of the development related to minerals and waste? Peat has many important qualities and the Authority has a policy relating to peat. How will this be used in determining applications in the Broads? As well as that, you may wish to look at policies relating to peat in terms of its removal and how it is to be treated in relation to its properties.
* Page 81 - are there any areas in Norfolk that could be investigated for unconventional hydrocarbons/fracking?
* Appendix 4: What about moorings and river bank stabilisation and other such applications that occur in the Broads but probably not elsewhere in Norfolk?
* General comment: headers and paragraph numbering would make the document easier to read - pages of text with no breaks was difficult to read.

Question 5: MW2
* Page 26, MW2 could mention dark skies. You could refer to the CPRE Night Blight data as well as our dark skies policy and zones.
* Page 27: Dark skies are important in the Broads and elsewhere. Perhaps more could be said about lighting: directing lighting downwards and away from properties and only lighting if needed and temporary versus permanent illumination.
* Page 27: 'A baseline ecological survey will be necessary where biodiversity features are present on a proposed site. Such surveys are essential in identifying what exists on a proposed mineral or waste management site and establishing whether such features should be retained and managed'. This is a bit confusing and seems to say that a survey would be needed to see if there are biodiversity features on a proposed site to then need a survey? We recommend that all sites would require baseline ecological survey and assessment of the presence of rare and protected species.
* Page 28: 'Local recreation assets, including Public Open Space and other outdoor facilities such as country parks, are protected in District, Borough and City Local Plans'. Also protected in the Local Plan for the Broads.
* Page 29: 'whilst others designated at a local level are subject to protection through District, Borough and City Local Plans'. Also mention the Local Plan for the Broads.

Question 6: MW3
* Page 33: 'All proposals for minerals development or waste management facilities must assess and consider positively the potential for non-HGV transportation of materials to and from the facilities, principally by rail or water'. Perhaps you might want to require an assessment that looks into this and shows their considerations? As written, an applicant does not seem to be required to do anything other than think about it.
* Page 33: 'The County Council will consider minerals and waste development proposals to be satisfactory in terms of access where anticipated HGV movements, taking into account any mitigation measures proposed, do not generate'. Wonder if this could be worded in a more simple way?

Question 7: MW4
* Uses the word 'should' which is quite weak term. A stronger term similar to that uses in other policies (like will need to, must, is required to) might be better.
* Some aspects repeat MW2 - does that matter?

Question 9: MW6
* Does MW6 repeats MW2?
* See previous comment about peat. Should peat be mentioned in this policy?

Question 11: WP2
* Page 45: what is 'appropriate transport infrastructure'?
* Page 45: is the five mile requirement as the crow flies or by road/path etc?

Question 12: WP3
* Page 46: 'Policy WP3: Land uses potentially suitable for waste management facilities'. This does not seem an ideal title for the policy; the policy seems to be more about where waste management facilities can go. Not all of the areas listed in the criteria are land uses in the typical sense; they are areas to which such facilities are directed towards.
* Page 46, do criteria d, e, f apply even if the proposal is not within 5 miles of a town as talked about in the previous policy? How do WP2 and WP3 work together?

Question 16: WP7
* WP7: regarding the location, these could be away from urban areas according to some criteria in WP3. Should these be located near to larger urban areas (i.e. near to the source of the waste)?

Question 22: WP13
* Are the areas of these landfills identified and are any in the Broads?

Question 25: WP16
* Should this include reference to MW2? That seems to have relevant and detailed criteria.

Question 28: Policy MP2
* The Broads, which has a status equivalent to a national park, may need to be listed as a planning constraint

Question 29: MP3
* There is no mention of the requirement for restoration.
* In other policies you cross refer to a more detailed policy, but not in this policy. Presumably policy MW2 is of relevance and could be cross referred to?

Question 31: MP5
* Who does the assessment? Does that need to be handed in with the planning application? How will you liaise with the Broads Authority if proposals come forward in the river valleys in the Broads rather than just consult? Why is the Broads not included in the core river valleys? Is a separate policy on the Broads required? Or is it the case that the Broads is not covered by this policy as the Broads Authority Executive Area is shown on the policies map as a landscape designation and so rivers and broads within the BEA not included under core river valleys policy, potentially affording greater protection i.e. development could be acceptable in Core River Valleys? This could usefully be clarified.
* In other policies you cross refer to a more detailed policy, but not in this policy. Presumably policy MW2 is of relevance and could be cross referred to?
Question 32: MP6
* What are the criteria or is there a checklist that helps ascertain if cumulative impacts are unacceptable?

Question 33: MP7
* As well as GI, ecological networks? There is ecological network work underway for the entire county which could be of relevance.
* The last part says 'The Green infrastructure Strategy' - which strategy is this? The strategy of the district in which the proposal is located?
* There is also a Norfolk-wide habitats map that could be of relevance.

Question 34: Policy MP8
* To gain the ecological benefits outlined for many of the sites an outline aftercare strategy for a minimum of ten years, rather than five years is required prior to the determination of the planning application

Question 35: MP9
* It is not clear if the works then need to be removed and form part of the restoration works or are moth-balled. This could usefully be clarified.

Sites Document
* MIN 38 - land at Waveney Forest, Fritton - the Authority supports the conclusion that this should not be allocated for the reasons as set out in the assessment. Page 169 - the landscape character assessment is also relevant: http://www.broads-authority.gov.uk/news-and-publications/publications-and-reports/planning-publications-and-reports/landscape-character-assessments. Broads Landscape Character Assessment 2016; Land considered as heathland Landscape Character Type (LCT) within the St Olaves to Burgh Castle Landscape Character Area (LCA). Land to the north and west considered to be estuarine marshland LCT within the same LCA. Haddiscoe Island LCA beyond river. The Authority strongly requests that Norfolk County Council liaise with us regarding this site and any future policy prior to the next version of the Local Plan. Strongly support this conclusion and the reasons for it. The current commercial forest operation, whilst not ideal in terms of the HE features within it, offers a degree of continued protection to those features. Page 169 Typographical error: "although food practice for tree felling" presumably should read good practice.

* MIN65; support submission of Heritage statement

* MIN 209, 210, 211; For information, the Broads Landscape Character Assessment 2016 says that this area is LCA Outney Common and Bath Hills, Industrial / Early post-industrial LCT boarders MIN 211. The Authority strongly requests that Norfolk County Council liaise with us regarding this site and the policy prior to the next version of the Local Plan. Support removal of plant site from BA executive area. What will go in its place?

* MIN 25; Broads Landscape Character Assessment 2016; Norton Marshes to Haddiscoe Dismantled Railway LCA immediately NE. Adjacent LCT is settlement fringe which would be covered in time by the Broads settlement fringe policy. Support submission of Heritage statement.Whilst this is not within the Broads, the Authority strongly requests that Norfolk County Council liaise with us regarding this site and the policy prior to the next version of the Local Plan.

MIN 92; Broads Landscape Character Assessment 2016; Chet Valley LCA, Carr woodland LCT to west and upland LCT to the north and south. Recommended not to support this site going forward (in terms of landscape) for reasons as set out in the supporting text under 'landscape'.