AOS E - land to the north of Shouldham

Showing comments and forms 91 to 120 of 3347

Object

Preferred Options consultation document

Representation ID: 93346

Received: 20/09/2019

Respondent: Ms Gemma Cole-Reeve

Representation Summary:

I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Comment:Please do not destroy this wonderful place

Full text:

Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Comments
Please do not destroy this wonderful place

Object

Preferred Options consultation document

Representation ID: 93347

Received: 25/09/2019

Respondent: C E Chandler

Representation Summary:

I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,

Full text:

Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,

Object

Preferred Options consultation document

Representation ID: 93348

Received: 20/09/2019

Respondent: Ms Diana New

Representation Summary:

I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Comments: To lose this beautiful place would be devastating , I walk in the Warren everyday. We walked there with our children and now our grandchildren. We played pooh sticks on the bridge and they now do that with there children. It's a place of outstanding beauty, the wildlife is amazing and the trees, a magical place, it helps me feel good about living. Sometimes when you hit a low point and you need something to lift you, well the Warren does this for me. A magical place that makes me think things through and lift my spirits. We all talk about climate change today and yet we are willing to destroy somewhere that's good for the environment, what good is the quarry, it will just devastate this area.

Full text:

Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.


Comments
To lose this beautiful place would be devastating , I walk in the Warren everyday. We walked there with our children and now our grandchildren. We played pooh sticks on the bridge and they now do that with there children. It's a place of outstanding beauty, the wildlife is amazing and the trees, a magical place, it helps me feel good about living. Sometimes when you hit a low point and you need something to lift you, well the Warren does this for me. A magical place that makes me think things through and lift my spirits. We all talk about climate change today and yet we are willing to destroy somewhere that's good for the environment, what good is the quarry, it will just devastate this area.

Object

Preferred Options consultation document

Representation ID: 93349

Received: 20/09/2019

Respondent: Ms Gemma Welham

Representation Summary:

I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Comment: We love shouldham just as it is

Full text:

Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Comments
We love shouldham just as it is

Object

Preferred Options consultation document

Representation ID: 93350

Received: 25/09/2019

Respondent: Mr John Jarvis

Representation Summary:

I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,

Full text:

Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,

Object

Preferred Options consultation document

Representation ID: 93351

Received: 20/09/2019

Respondent: Ms Georgina Hogarth

Representation Summary:

I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Comment: It's self explanatory, there is no need to destroy even more of our precious natural habitats. Find somewhere else.

Full text:

Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Comments
It's self explanatory, there is no need to destroy even more of our precious natural habitats. Find somewhere else.

Object

Preferred Options consultation document

Representation ID: 93352

Received: 25/09/2019

Respondent: Ms Patricia Jarvis

Representation Summary:

I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,

Full text:

Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,

Object

Preferred Options consultation document

Representation ID: 93353

Received: 25/09/2019

Respondent: Mr J Lock

Representation Summary:

I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,

Full text:

Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,

Object

Preferred Options consultation document

Representation ID: 93354

Received: 20/09/2019

Respondent: Ms Georgina Tomlinson

Representation Summary:

I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Full text:

Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Object

Preferred Options consultation document

Representation ID: 93355

Received: 20/09/2019

Respondent: Mr Giles Clark

Representation Summary:

I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Comment: having heaped opprobrium on the Brazilian president for allowing the destruction of large parts of the rainforest, it seems odd that we should then set about destroying woodland in the UK. Clearly this isn't the Amazon rainforest, but we do need trees and to destroy an existing ancient stand like this seems almost criminal.

Full text:

Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Comments
having heaped opprobrium on the Brazilian president for allowing the destruction of large parts of the rainforest, it seems odd that we should then set about destroying woodland in the UK.
Clearly this isn't the Amazon rainforest, but we do need trees and to destroy an existing ancient stand like this seems almost criminal.

Object

Preferred Options consultation document

Representation ID: 93357

Received: 20/09/2019

Respondent: Ms Helen Crossley

Representation Summary:

I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Full text:

Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Object

Preferred Options consultation document

Representation ID: 93358

Received: 20/09/2019

Respondent: Ms Helen Mileham

Representation Summary:

I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Full text:

Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Object

Preferred Options consultation document

Representation ID: 93359

Received: 20/09/2019

Respondent: Ms Irene Trocado

Representation Summary:

I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Full text:

Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Object

Preferred Options consultation document

Representation ID: 93361

Received: 26/09/2019

Respondent: Ms Jane Frost

Representation Summary:

I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Comment: As a resident of fenland Shouldham is one of the few forested places we have access to. it makes no sense to quarry there, wildlife and people need spaces that are free from noise and pollution.

Full text:

Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Comments
As a resident of fenland Shouldham is one of the few forested places we have access to. it makes no sense to quarry there, wildlife and people need spaces that are free from noise and pollution.

Object

Preferred Options consultation document

Representation ID: 93362

Received: 20/09/2019

Respondent: Ms Jane Jakes

Representation Summary:

I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Full text:

Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Object

Preferred Options consultation document

Representation ID: 93363

Received: 20/09/2019

Respondent: Ms Jaqueline Rhodes

Representation Summary:

I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Full text:

Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Object

Preferred Options consultation document

Representation ID: 93364

Received: 20/09/2019

Respondent: Ms Jessica Sturman

Representation Summary:

I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Full text:

Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Object

Preferred Options consultation document

Representation ID: 93365

Received: 25/09/2019

Respondent: Ms Jennifer Lock

Representation Summary:

I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,

Full text:

Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,

Object

Preferred Options consultation document

Representation ID: 93366

Received: 20/09/2019

Respondent: Jo King

Representation Summary:

I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Comment: SHAME ON YOU NCC...

Full text:

Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Comments
SHAME ON YOU NCC...

Object

Preferred Options consultation document

Representation ID: 93367

Received: 20/09/2019

Respondent: Mr John Holman

Representation Summary:

I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Full text:

Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Object

Preferred Options consultation document

Representation ID: 93368

Received: 25/09/2019

Respondent: A G Airey

Representation Summary:

I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,

Full text:

Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,

Object

Preferred Options consultation document

Representation ID: 93369

Received: 25/09/2019

Respondent: A R Airey

Representation Summary:

I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,

Full text:

Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,

Object

Preferred Options consultation document

Representation ID: 93370

Received: 20/09/2019

Respondent: Ms Julie Parker

Representation Summary:

I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Full text:

Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Object

Preferred Options consultation document

Representation ID: 93371

Received: 25/09/2019

Respondent: Mr Paul Goldspink

Representation Summary:

Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,

Full text:

Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,

Object

Preferred Options consultation document

Representation ID: 93372

Received: 20/09/2019

Respondent: Ms Karen Shand

Representation Summary:

I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Full text:

Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Object

Preferred Options consultation document

Representation ID: 93373

Received: 25/09/2019

Respondent: C Eves

Representation Summary:

I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,

Full text:

Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,

Object

Preferred Options consultation document

Representation ID: 93374

Received: 20/09/2019

Respondent: Ms Karen Smith

Representation Summary:

I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Full text:

Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Object

Preferred Options consultation document

Representation ID: 93375

Received: 25/09/2019

Respondent: Mr Richard Ashby

Representation Summary:

I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,

Full text:

Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,

Object

Preferred Options consultation document

Representation ID: 93376

Received: 20/09/2019

Respondent: Mr Karl Osborn

Representation Summary:

Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.


Comment: This would be such a loss for the whole of East Anglia!
I walk here with the family and ride mountain here bikes too. It's over an hour drive away but I'm still happy to make the trip regularly as it's an unspoilt natural woodland

Full text:

Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.

Comments
This would be such a loss for the whole of East Anglia!
I walk here with the family and ride mountain here bikes too. It's over an hour drive away but I'm still happy to make the trip regularly as it's an unspoilt natural woodland

Object

Preferred Options consultation document

Representation ID: 93377

Received: 25/09/2019

Respondent: Ms Christine Ashby

Representation Summary:

I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,

Full text:

Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,