AOS E - land to the north of Shouldham
Object
Preferred Options consultation document
Representation ID: 93410
Received: 20/09/2019
Respondent: Mr Nick Malby
I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Comments
It is unthinkable in this age of environmental awareness that a site of such peace and beauty could be destroyed just to extract sand
Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Comments
It is unthinkable in this age of environmental awareness that a site of such peace and beauty could be destroyed just to extract sand
Object
Preferred Options consultation document
Representation ID: 93411
Received: 20/09/2019
Respondent: Ms Nicola Stewart
Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Comment: My family have lived in the Warren for years some of my aunts and uncles born there in warren house too. It holds so many fond memories for us all and to see it destroyed is heart breaking for so many
Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Comments
My family have lived in the Warren for years some of my aunts and uncles born there in warren house too. It holds so many fond memories for us all and to see it destroyed is heart breaking for so many
Object
Preferred Options consultation document
Representation ID: 93413
Received: 20/09/2019
Respondent: Ms N Dowell
I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Comment: As a nation, I firmly believe we need to make it a priority to preserve our areas of natural beauty.
Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Comments
As a nation, I firmly believe we need to make it a priority to preserve our areas of natural beauty.
Object
Preferred Options consultation document
Representation ID: 93414
Received: 20/09/2019
Respondent: Ms Olivia Shaw
I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Object
Preferred Options consultation document
Representation ID: 93415
Received: 20/09/2019
Respondent: Ms Olive Ramshaw
I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Comments: I live at shouldham and use the woods with family and friends and my dogs.I visit it several times and week and spend hours up there.My life would be changed for the worse if access was retricted and would probectly move if can afford to .I t is a haven for wildlife and plants ,alot of protected adders would need to be relocated.This wonderful recreational area would be lost to so many people ,walkers ,cyclists ,runners and dog owners to name but a few.
Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Comments
I live at shouldham and use the woods with family and friends and my dogs.I visit it several times and week and spend hours up there.My life would be changed for the worse if access was retricted and would probectly move if can afford to .I t is a haven for wildlife and plants ,alot of protected adders would need to be relocated.This wonderful recreational area would be lost to so many people ,walkers ,cyclists ,runners and dog owners to name but a few.
Object
Preferred Options consultation document
Representation ID: 93416
Received: 20/09/2019
Respondent: Ms Pamela Dawe
I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Comments
This woodland is a place of calmness .we use it it everyday all through the year.
We are carers of [redacted text - personal data] young people ,the woods at Shouldham provides a sensory environment,calming and peaceful in a very busy world .
We would all suffer if the woods were to be removed.
Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Comments
This woodland is a place of calmness .we use it it everyday all through the year.
We are carers of [redacted text - personal data] young people ,the woods at Shouldham provides a sensory environment,calming and peaceful in a very busy world .
We would all suffer if the woods were to be removed.
Object
Preferred Options consultation document
Representation ID: 93417
Received: 20/09/2019
Respondent: Ms Paula Cleary
I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Comment: Our family objects to this wholly and passionately! Can these things not be done in the most remote parts of this vast beautiful country? Why here in Norfolk where children play and families enjoy these green lungs?
Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Comments
Our family objects to this wholly and passionately! Can these things not be done in the most remote parts of this vast beautiful country? Why here in Norfolk where children play and families enjoy these green lungs?
Object
Preferred Options consultation document
Representation ID: 93418
Received: 25/09/2019
Respondent: Ms Lucy Hipperson
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93419
Received: 20/09/2019
Respondent: Ms Penelope Seeger
I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Object
Preferred Options consultation document
Representation ID: 93420
Received: 25/09/2019
Respondent: J Norris
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93421
Received: 20/09/2019
Respondent: Mr Peter McLeland
I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Comment: I hope to live there one day!
Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Comments
I hope to live there one day!
Object
Preferred Options consultation document
Representation ID: 93422
Received: 20/09/2019
Respondent: Mr Peter Sneesby
I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Comments: You should also note that several species of birds of prey have taken up residence in the Wormegay area. Owls are now a common sight in this area and to lose this resurgence of wildlife would be immoral.
Norfolk is the bread basket of the country, a fact that may be of vital importance in years to come. We should not be giving over extremely fertile farm lands over to unwanted quarries and proposed landfill.
Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Comments
You should also note that several species of birds of prey have taken up residence in the Wormegay area. Owls are now a common sight in this area and to lose this resurgence of wildlife would be immoral.
Norfolk is the bread basket of the country, a fact that may be of vital importance in years to come. We should not be giving over extremely fertile farm lands over to unwanted quarries and proposed landfill.
Object
Preferred Options consultation document
Representation ID: 93423
Received: 20/09/2019
Respondent: Mr Philip Bancroft
I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Comment: This would be a horrendous and unforgivable destruction of an amazing piece of land.
Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Comments
This would be a horrendous and unforgivable destruction of an amazing piece of land.
Object
Preferred Options consultation document
Representation ID: 93424
Received: 25/09/2019
Respondent: T Rees
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93425
Received: 20/09/2019
Respondent: Ms Philippa Pease
I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Object
Preferred Options consultation document
Representation ID: 93426
Received: 20/09/2019
Respondent: Mr Richard Burlingham
I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Object
Preferred Options consultation document
Representation ID: 93427
Received: 25/09/2019
Respondent: Mrs Paula Goldspink
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93428
Received: 25/09/2019
Respondent: Mr Phillip Bloomfield
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93429
Received: 25/09/2019
Respondent: Ms Gillian Bloomfield
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93430
Received: 25/09/2019
Respondent: Mrs A Tudberry
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93431
Received: 25/09/2019
Respondent: Mr Gary Coombs
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93432
Received: 25/09/2019
Respondent: Ms Leah Coombs
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93433
Received: 25/09/2019
Respondent: Mr Jake Coombs
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93434
Received: 25/09/2019
Respondent: Mrs G Coombs
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93435
Received: 20/09/2019
Respondent: Mr Richard Nee
I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Object
Preferred Options consultation document
Representation ID: 93436
Received: 20/09/2019
Respondent: Ms Sabrina Norman
I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Object
Preferred Options consultation document
Representation ID: 93437
Received: 20/09/2019
Respondent: Ms Samantha Cooper
I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Comment: Save our beautiful woodland.
Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Comments
Save our beautiful woodland.
Object
Preferred Options consultation document
Representation ID: 93439
Received: 20/09/2019
Respondent: Ms Stephanie Long
I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Object
Preferred Options consultation document
Representation ID: 93440
Received: 20/09/2019
Respondent: Tor McIntosh
I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Comment: I wholeheartedly object to turning this precious woodland into a quarry for all the reasons stated above. This is such an important natural environment on many levels and should never be destroyed.
Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Comments
I wholeheartedly object to turning this precious woodland into a quarry for all the reasons stated above. This is such an important natural environment on many levels and should never be destroyed.
Object
Preferred Options consultation document
Representation ID: 93441
Received: 20/09/2019
Respondent: Ms Veronica Leavy
I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Comment: This is abhorrent. Please do not destroy this area of natural beauty.
Objection to NCC
To: Caroline Jeffery, Principal Planner (Minerals and Waste Policy) Norfolk County Council Objection to Quarrying in AOS E at Shouldham and Marham, Norfolk I object to silica sand mining taking place in the area of Area Of Search (AOS) E and its surroundings as proposed in the Norfolk County Council Mineral & Waste Local Plan, Preferred Options July 2019. It is used for outdoor exercise by 1000s of people; young and old. The loss of long-established woodlands would be devastating for mental health and physical well-being. It would be a disaster for the biodiversity of flora and fauna supported by that ecosystem. The destruction of woodland, never to be restored, is unacceptable at a time when Govt's policy (Clean Growth Strategy) is to increase the number of trees in the UK - "Establish a new network of forests in England... plant 11 million trees". We are facing a Climate Crisis. Shouldham Warren is one of our precious planet's lungs, capturing 11,000 tonnes of C02 per year. The Warren provides clean air, home to precious biodiversity and valuable educational space for children. The lack of an improved glass recycling plan to increase the amount of glass cullet available to UK glass manufacturers makes further quarrying for silica sand at the current rate morally wrong. "Our environment is our most precious inheritance," says DEFRA, so I urge Norfolk County Council to not allocate the woodlands and agricultural farmland in AOS E and remove AOS E from the Mineral & Waste Local Plan.
Comments
This is abhorrent. Please do not destroy this area of natural beauty.