AOS E - land to the north of Shouldham
Object
Preferred Options consultation document
Representation ID: 93472
Received: 26/09/2019
Respondent: Mr Barry Godden
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93473
Received: 26/09/2019
Respondent: Ms Sally Godden
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93474
Received: 26/09/2019
Respondent: Chris Hotson
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93475
Received: 26/09/2019
Respondent: Mr R Hammond
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93476
Received: 26/09/2019
Respondent: Mrs A Hammond
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93477
Received: 26/09/2019
Respondent: Mrs Joan Glenn
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93478
Received: 26/09/2019
Respondent: Mr Robert Button
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93479
Received: 26/09/2019
Respondent: H Simpson
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93480
Received: 26/09/2019
Respondent: Ms Jane Simpson
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93481
Received: 26/09/2019
Respondent: Ms Cheryl Rasmusson
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93482
Received: 26/09/2019
Respondent: A Rasmusson
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93483
Received: 26/09/2019
Respondent: Mr Frederick Ross
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93487
Received: 26/09/2019
Respondent: Mrs Barbara Ross
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93488
Received: 26/09/2019
Respondent: Mr Calvin Lawrence
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93489
Received: 26/09/2019
Respondent: Ms Paula Lawrence
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93490
Received: 26/09/2019
Respondent: Mr Iain Grimes
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93491
Received: 26/09/2019
Respondent: Ms Suzanna Grimes
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93492
Received: 26/09/2019
Respondent: A Devereux
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93493
Received: 26/09/2019
Respondent: Ms Jean Devereux
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93494
Received: 26/09/2019
Respondent: Mr Gerald Shinn
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93495
Received: 26/09/2019
Respondent: Ms Janet Shinn
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93496
Received: 30/09/2019
Respondent: Mr Nick Mackay
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93497
Received: 30/09/2019
Respondent: Ms Lorna MacKay
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93498
Received: 30/09/2019
Respondent: Mr Les Rawlings
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93499
Received: 30/09/2019
Respondent: J Waudby
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93500
Received: 30/09/2019
Respondent: Mr Wolfgang Huer
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93501
Received: 30/09/2019
Respondent: Mrs S Bond-Waudby
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93502
Received: 30/09/2019
Respondent: Lesley Freeman
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93503
Received: 30/09/2019
Respondent: Mr David Freeman
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Object
Preferred Options consultation document
Representation ID: 93504
Received: 30/09/2019
Respondent: Ms Jade Shelden
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,
Objection to AOS E - Land Between Marham and Shouldham and includes Shouldham Warren
I object to AOS E, including Shouldham Warren and the overlap with formerly SIL 02, in the Norfolk Minerals and Waste Local Plan. I strongly object to the fact that Norfolk County Council has deliberately misled residents by announcing the removal of SIL 02 when in reality a third of it is now/still included in AOS E.
As a member of the community, I echoed the concerns held by the Ministry of Defence when they objected to these proposals, due to the fact that the plan of a wet working and restoration in close proximity to RAF Marham, well within the statutory 13 kms limit, will increase the risk of "bird strikes" or worst-case scenario, end in an aircraft crash and potential loss of life. The economic cost of such a mishap would be greater than £100M just to replace an F35 Lightning II; add to that the costs for the emergency services and for the immediate and subsequent treatments through the NHS for the physical and mental injuries caused, and the financial costs become an unaffordable risk.
Permanent loss of agricultural land will impact rural Norfolk, its farming jobs, jobs of local employees i.e. British Sugar, including the increased need for home grown food, due to the impact of Brexit.
I object to the negative impact on villagers'/visitors' health. According to Public Health Profile 2018, our villages have higher levels of respiratory problems and reduced respiratory function (Chronic Obstructive Pulmonary Disease, Asthma), silica particles will exacerbate these conditions. Loss of natural spaces has been proven to adversely affect health, mental and physical. This fenland and forest (Shouldham Warren) is our community's public open space, our gym and our sanctuary, hundreds of people use it daily for physical recreation and social wellbeing interactions.
I object to the fact that the plan would ruin the Landscape, Shouldham Warren, the Countryside, including habitats for birds, animals, and insects. The Warren is home to 64 species of conservation concern, including endangered bats, nightjars and woodlarks. We need nature and trees now more than ever to combat pollution and climate change.
I object to the unsustainable use of a finite mineral resource, when the county only recycles a fraction of the glass already in circulation. There are national government policies and guidance including DEFRA and the Dept for Business Energy & Industrial Strategy that are clearly being ignored in order to allow a privately-owned Belgian company to profit from the devastation of our community asset, landscape and environment.
I further object to the worrying possibility of damage to our Public Water. It is very concerning that if quarrying was allowed to take place, whether through wet or dry working, the water supply could be affected, as the whole area of AOS E has very productive to moderately productive aquifers.
A further objection relates to the lack of restoration plans. Any restoration would take in excess of 30 years, until then the community would suffer from a devastated industrial landscape, increased flow of heavy articulated lorries, preventing any appreciation of its landscape and countryside. Sibelco has a poor track record for restoration in the area, and have failed to ensure safety of sites after extraction - its Bawsey site was the cause of deaths by drowning. The company has not been a 'good neighbour' and has done nothing to engage with the community or alleviate residents' concerns.
Lastly, I object to the fact that there would be no benefit to the local community or economy if this proposal goes through. What is clear is that a number of local communities will bear the brunt of a hugely disruptive and harmful industrial process; that a very popular public amenity enjoyed by a much larger section of the population will be permanently lost; and the only beneficiaries of this development will be a few landowners, Norfolk County Council, but principally the private owners of the Belgian company Sibelco.
Given that County Councils are responsible for the provision of public services for taxpayers and community wellbeing, and not the promotion of harmful and irresponsible businesses that present no local benefit, but with multiple risks, dictates that Norfolk County Council should put public interest before private profit.
Please record this as my objection,