Proposed Main Modifications

Ends on 13 December 2024 (56 days remaining)

Appendix 1- revised key diagram (MM04)

Key diagram West, shown as deleted Map of the western half of Norfolk on the key diagram showing the location of the urban areas, main towns, safeguarded mineral, Valued Landscape-Area of Outstanding Natural Beauty, Heritage Coast, trunk roads, A-roads, railway lines, flood risk zones 2 and 3, groundwater source protection zone 1, environmental designations, stone curlew protection zones, existing mineral infrastructure, existing mineral extraction sites, existing waste management sites, and allocated mineral extraction sites.

Key diagram East, shown as deleted Map of the eastern half of Norfolk on the key diagram showing the location of the urban areas, main towns, sand and gravel resource, Valued Landscape-Area of Outstanding Natural Beauty, the Broads, trunk roads, A-roads, railway lines, flood risk zones 2 and 3, groundwater source protection zone 1, environmental designations, existing mineral infrastructure, existing mineral extraction sites, existing waste management sites, and allocated mineral extraction sites.

For instructions on how to use the system and make comments, please see our help guide.
back to top back to top