Object

Preferred Options consultation document

Representation ID: 94925

Received: 29/10/2019

Respondent: Mr JJ Gallagher

Representation Summary:

MP6 - The areas around Shouldham and Marham have a plethora of mineral sites and plants already, and whilst MP6 is to address cumulative impacts of phased workings the M&WLP fails to address the other potential cumulative impacts in an area, e.g. a close military airbase with the persistent jet noise. Neither does it mention the cumulative impacts of the period of time for working an area if it is to be prolonged. Without these consideration being added to the policy, it is unsound.

Full text:

MP6 - The areas around Shouldham and Marham have a plethora of mineral sites and plants already, and whilst MP6 is to address cumulative impacts of phased workings the M&WLP fails to address the other potential cumulative impacts in an area, e.g. a close military airbase with the persistent jet noise. Neither does it mention the cumulative impacts of the period of time for working an area if it is to be prolonged. Without these consideration being added to the policy, it is unsound.